HomeBreaking NewsNagawara–Tin Factory corridor choked by median gaps and metro works

Nagawara–Tin Factory corridor choked by median gaps and metro works

Bengaluru’s Nagawara flyover–Tin Factory corridor is facing daily peak-hour congestion, with vehicle queues stretching for kilometres as open medians, unauthorised U-turns, missing bus bays and metro construction disrupt traffic movement, according to a Deccan Herald report.

The affected stretch carries commuters travelling from the Nagawara flyover towards Tin Factory. Residents and traffic wardens told the newspaper that vehicles frequently slow down or stop at multiple openings in the central divider, allowing motorists to make U-turns at locations that are not designated for the manoeuvre.

Traffic warden Shree Ram Bishnoi said the open sections of the median were interrupting the continuous flow of traffic. He also pointed to the absence of designated BMTC bus bays, inadequate traffic regulation and insufficient barricading.

“The unnecessary openings in the central divider have not been properly closed, and there is little coordination between the traffic police, BBMP, BMTC and the metro authorities to address the recurring problem,” Bishnoi was quoted as saying.

Commuters also described bottlenecks at specific points on the corridor. Auto driver Nagaraju said a barrier protruding onto the road near the flyover entrance forces vehicles in the right lane to move left, bringing them into conflict with traffic approaching from the left.

Another commuter, Sridhar, said the median near the Hennur underpass remained open, enabling vehicles from the service road to take U-turns. He urged Namma Metro to maintain proper traffic-safety arrangements while construction work is under way.

Residents and commuters have called for unnecessary median openings to be closed, barricades to be installed against unauthorised U-turns and turning movements to be restricted to designated locations.

A senior officer at the jurisdictional KG Halli traffic police station said metro construction workers open and close medians and move barricades when required, under the direction of metro authorities. The officer said traffic was expected to return to normal after the project was completed.

The report does not record responses from BBMP, BMTC or the metro authorities to the concerns about median management, bus-stop arrangements or coordination between agencies. Until construction-related traffic controls are changed, commuters using the Nagawara–Tin Factory route continue to face delays and unpredictable lane movements during peak periods.


RELATED ARTICLES

Most Popular

Latest News