HomeBreaking NewsBhide Bridge Closure in Pune to Disrupt Traffic Until December 31

Bhide Bridge Closure in Pune to Disrupt Traffic Until December 31

The Bhide Bridge over the Mutha River in Pune will be completely closed to vehicular traffic from 6 am on November 19 until December 31, 2026, as Pune Metro constructs a pedestrian bridge linking Deccan Gymkhana Metro Station with neighbourhoods on the eastern side of the river.

The closure has been announced as a public safety measure during construction. The pedestrian bridge is being built above the existing Bhide Bridge and is intended to improve access to Deccan Gymkhana Metro Station for residents of Narayan Peth, Shaniwar Peth and areas around Laxmi Road.

Pune Metro said the new connection will also support students travelling to educational institutions in the area. The restriction will affect vehicles using the bridge, although the road running through the Mutha Riverbed will remain open to traffic during the construction period.

Commuters have been advised to use Lakdi Bridge, Balgandharva Bridge and Z Bridge as alternative crossings while Bhide Bridge remains shut. These routes will carry additional traffic during the closure, particularly for journeys connecting central Pune neighbourhoods with Deccan Gymkhana and surrounding areas.

The closure illustrates how metro construction is affecting road movement beyond the immediate station footprint. In this case, the work is intended to address the last-mile connection between an elevated or station-area transport facility and dense older neighbourhoods across the river. The pedestrian bridge will provide a dedicated access route for people travelling to the station without depending on the existing vehicular crossing.

Pune Metro has appealed to citizens to cooperate with the traffic restriction and plan their journeys in advance. The authority has also expressed regret for the inconvenience caused to commuters and said the pedestrian bridge connecting Deccan Gymkhana Metro Station would be completed as soon as possible.

The closure is scheduled to remain in force until December 31, 2026. Until work is completed, motorists will need to use the designated alternative bridges, while traffic on the Mutha Riverbed road will continue to remain open.


RELATED ARTICLES

Most Popular

Latest News