HomeBreaking NewsKrishna Water Dispute Escalates Over Palnadu Grid Project

Krishna Water Dispute Escalates Over Palnadu Grid Project

Telangana’s dispute with Andhra Pradesh over Krishna river water intensified on Thursday after Telangana officials alleged that Andhra Pradesh released 15,000 cusecs from the Nagarjuna Sagar project without prior intimation, while Roads and Buildings Minister Komatireddy Venkat Reddy acknowledged a government lapse in protecting the State’s interests.

The Andhra Pradesh government has been constructing the Palnadu Water Grid project, including an intake well sump in the backwaters of the Nagarjuna Sagar reservoir near Vijayapuri South. Telangana has objected to the project, alleging that it was taken up without permission and in violation of existing reservoir regulations.

The Telangana Retired Engineers Association recently inspected the construction and made the regulatory violation allegations, according to Telangana Today. The report did not include a response from Andhra Pradesh officials to those claims.

Venkat Reddy said the Congress government had made a mistake in handling the Krishna water issue and described the failure to protect Telangana’s interests as a lapse. He alleged that Superintending Engineer Mallikarjun, posted at Nagarjuna Sagar, had known about the construction for the past year but did not inform the Telangana government. The minister said he had warned the official to resign and that applying for leave would not be sufficient.

The minister also alleged that the matter involved a conspiracy by some people within the government. Those allegations were not independently substantiated in the report.

The immediate tension followed the release of about 15,000 cusecs through Nagarjuna Sagar’s right canal to Andhra Pradesh. Telangana officials subsequently released a similar quantity through the left canal, according to the report. Andhra Pradesh was alleged to have cited drinking water requirements in some regions as the reason for its release.

The dispute places the operation of a major inter-State reservoir and the proposed Palnadu water infrastructure project at the centre of renewed tensions between the two Telugu States. The report did not specify any confirmed next step by either government or by the authority responsible for regulating the reservoir.


RELATED ARTICLES

Most Popular

Latest News