HomeAnalysisBengaluru Road Plan Faces Land and Compensation Gridlock

Bengaluru Road Plan Faces Land and Compensation Gridlock

Bengaluru’s proposed road circulation maps could leave planned links stalled unless the state clarifies how landowners will surrender land, receive compensation and secure development rights, according to a report by Deccan Herald.

The issue is visible on Hennur Road, also known as New Airport Road, where a six-lane carriageway narrows near the Sri Channakeshava Swamy Temple shortly after crossing the Outer Ring Road. The resulting bottleneck has persisted for years, with the Greater Bengaluru Authority (GBA) yet to widen the stretch and the adjoining property owners not developing their land in a way that would require part of it to be handed over for the road, the report said.

That stand-off illustrates a wider problem on Bengaluru’s expanding edges: roads marked in planning documents often do not become usable connections. The report said several peripheral roads remain narrow or incomplete because land has neither been acquired by the civic authorities nor voluntarily surrendered during development.

Under the existing approach described in the report, road widening generally takes place in two ways. The civic body can issue a public notification to acquire properties and offer compensation through Transferable Development Rights (TDR). Alternatively, a property owner developing a high-rise or layout can be required to surrender part of the land free of charge as a condition of plan approval.

In practice, voluntary surrender during new development has produced more road-building than formal acquisition, the report said. The result is a patchwork of missing links and inadequate road capacity, particularly in areas that have urbanised faster than their transport networks. Temporary structures and shops may also appear along proposed road alignments while the planned roads remain pending, adding to congestion.

The pressure is especially evident along Sarjapur Road. A study of the 17-kilometre stretch cited by Deccan Herald found that Bengaluru has added nearly 150 square kilometres of built-up area every decade since 1990, while road provision has not kept pace. Sarjapur reportedly has 10 kilometres of road per square kilometre, compared with 30 kilometres in Vijayanagar and 23 kilometres in Jayanagar. Whitefield, Dommasandra and Doddakannelli were reported to have between 8 and 14.5 kilometres of road per square kilometre.

The new road circulation maps are intended to address part of this deficit. The GBA has marked tens of kilometres of private and public land for roads, and officials said the maps were approved under Section 12(1)(b) of the Karnataka Town and Country Planning Act, 1961. Published on October 12, the draft maps were open to objections for two months, according to the report. After final notification and any legal scrutiny, land marked in the maps would be reserved for road use.

Reservation alone, however, does not create a road. The report said a proposed alignment could remain blocked unless the owner undertakes development or the authorities issue a separate notification identifying properties for acquisition. It also said there is no clear framework allowing landowners to voluntarily surrender land for a mapped road, receive compensation and complete the transaction without waiting for a further acquisition notification.

That gap creates different consequences for large and small landowners. Owners of larger parcels may be able to use additional development potential or floor space index (FSI) associated with surrendering land. Smaller owners may not have sufficient land to benefit from extra floors. If most of a small plot is marked for a road, the owner may be unable to develop it, surrender it voluntarily or claim compensation while the road remains unbuilt.

HM Chandrasheker, a Hoodi resident whose land was notified for a road, told Deccan Herald that building plans had been rejected because the land formed part of a road in the Comprehensive Development Plan, even though many roads identified in the 2007 Bengaluru Development Authority Master Plan had not been built. He described the situation as raising concerns about natural justice and property rights.

A senior Urban Development Department official acknowledged that the proposal could create difficulties for small landowners but said their numbers would be limited. The official also argued that property values could rise significantly and defended the requirement for free handover where owners could build additional floors.

Greater Bengaluru Development Minister Krishna Byre Gowda said the government was examining ways to make the TDR scheme more attractive. He said the government was also insisting that local planning authorities use at least 50% of their revenue for long-term infrastructure, including roads, water and sewage connections. He added that the government would consider allowing landowners to surrender land voluntarily without waiting for a separate acquisition notification.

Urban planner Dhanya Thejas told the newspaper that Andhra Pradesh and Telangana had policies enabling landowners to surrender land and seek compensation without a separate acquisition notification. He suggested that Bengaluru’s TDR compensation be doubled to reflect higher land values in peripheral areas.

The implementation question is therefore not only where Bengaluru plans roads, but how the city moves from a protected alignment to a funded, legally workable and physically constructed link. Until acquisition, compensation and voluntary surrender are governed by a clear process, new circulation maps may protect future road space without resolving today’s bottlenecks.


RELATED ARTICLES

Most Popular

Latest News