The Ahmedabad Municipal Corporation has removed 75 structures and encroachments from planned roads in Makarba and Sanathal, opening a combined 1,625 metres of road space, according to a report by Gujarat Samachar.
In Makarba, within the Vejalpur ward, the civic body cleared 51 encroachments from a road running parallel to the railway crossing between Torrent Power and Boot Bhavani Temple. The cleared stretch measures 525 metres. The report said the action included 29 residential structures, 14 commercial structures, five religious structures and three compound walls.
The Makarba road is currently unpaved. The Ahmedabad Municipal Corporation is expected to undertake paving work after the encroachments have been removed, the report said. The route could provide an alternative connection for residents and motorists travelling towards Makarba while work on a bridge at the Vastrapur railway crossing has led to the closure of that road.
In Sanathal, within the Sarkhej ward, the corporation removed 24 commercial structures along a 12-metre-wide planned road running parallel to the Ring Road, between Sanathal junction and Bakrol. The cleared stretch measures 1,100 metres and falls under Town Planning Scheme No. 444, Sanathal.
Together, the two operations have opened 1.62 km of planned road alignments. The clearances are intended to restore access along roads reserved under town-planning layouts, but the immediate usability of the Makarba stretch will depend on the completion of paving work. The report did not provide a schedule for construction of the permanent road or details of any rehabilitation or compensation measures for affected occupants.


