The Bhubaneswar Municipal Corporation has intensified drainage, dewatering and road-clearance operations after heavy rain and strong winds associated with Cyclone Akvan caused waterlogging, blocked culverts and uprooted trees across parts of the city, according to a report by Pragativadi.
The civic body has deployed special teams across multiple wards to desilt choked drains, clear culverts, pump out stagnant rainwater and remove trees and branches obstructing arterial roads. BMC officials said the operations were aimed at restoring normal conditions and addressing localised hazards after the severe weather.
Mayor Sulochana Das and BMC Commissioner Chanchal Rana have been monitoring the response from the corporation’s 24×7 Command Control Room, the report said. Das also visited Ward No. 4 and other low-lying areas, as well as temporary cyclone shelters, where she interacted with evacuees. She was accompanied by members of the BMC’s health and sanitation, works and slum settlement committees, corporator Ajit Behera and senior officials.
The corporation intensified desilting and pumping operations on Friday. Jetting machines were used at the Kandara Pokhari drain and adjoining culverts, while high-capacity pumps were deployed near Saradha Math in Ward No. 59. BMC teams also cleared obstructions affecting water flow at Hanspal.
Drain and culvert cleaning was reported near CRPF Square, Priyadarshini Market’s R&B drain, Rental Colony School in Ward No. 15, Jharana Sahi, Laxmisagar Traffic Square, the Old Bus Stand, the Naharkanta 7(2) drain and Kamala Nehru College. These operations were intended to improve the discharge of accumulated stormwater from waterlogged areas.
Tree-cutting squads cleared uprooted trees and broken branches from several roads and neighbourhoods, including BDA Colony near Tarini Temple, Sailashree Vihar, Salia Sahi, Niladri Vihar Lane-3, Samantarapur-Lingaraj Temple Road, Pokhariput Bhakta Madhu Nagar Lane-7, Kalinga Nagar, Jharpada Square, Ashok Nagar, Unit-2, Master Canteen and Rajmahal Square.
Under the commissioner’s direction, BMC officers and field staff remain on high alert, according to the report. Rapid Action Teams are responding to complaints received through the corporation’s 1929 helpline and social media platforms, with the stated objective of resolving localised drainage, access and obstruction problems.
The response places immediate emphasis on restoring road movement and stormwater flows in areas affected by the cyclone rains. The report does not provide a citywide assessment of remaining waterlogging, damage or the duration of the clearance operations.


