Seven mature trees obstructing construction of an elevated corridor on Amaravati’s Seed Access Road Phase-3 project will be relocated instead of cut down, the Amaravati Development Corporation (ADC) said during an inspection on Saturday.
ADC chairperson and managing director D. Lakshmi Parthasarathi directed officials to uproot the trees, which include peepal and neem and are estimated to be around 50 years old, with their root systems intact. They are to be transplanted at Sakhamuru Central Park.
The trees are located near the boating yard at Sitanagaram, where work is under way on an elevated corridor along the Buckingham Canal. The 3.4-km Seed Access Road stretch is being developed between Undavalli and the Tadepalli bridge.
During the inspection, Parthasarathi also reviewed the construction of 14 pillars near the boating yard and sought updates from representatives of NCC, which is involved in the works, according to the report.
She later inspected road, water supply, power and drainage network works under E-3 Phase-1 and Phase-2. The inspection also covered labour conditions at the project site.
Construction workers told her that masons were being paid Rs 1,000 a day and helpers Rs 800 a day, with wages credited directly to their bank accounts every Saturday, the report said.
ADC chief engineer T. Moses Kumar, superintending engineer T. Vaikuntha Rao, executive engineer Sridhar Reddy, deputy executive engineer Y. Appaji and assistant engineer Nagarjuna accompanied the inspection.


