Bengaluru’s road planning is showing inconsistencies across agencies, with variations in road widths, proposed roundabouts and gaps where different road plans meet, according to a report by Deccan Herald. The findings raise questions about whether the city’s expanding road network is being designed under a common framework.
The report examined road plans prepared by the Greater Bengaluru Authority (GBA), the Bengaluru Development Authority (BDA) and other agencies. It said several plans do not conform to guidelines issued by the Indian Roads Congress (IRC), which sets road design standards in India.
The IRC prescribes standard road widths of 9, 12, 18 and 24 metres. However, the BDA’s road circulation map includes widths of 12.2, 18.3 and 25 metres. The report described these dimensions as unusual for Bengaluru’s road planning history.
The map also proposes roundabouts at locations where earlier plans had not included them. Experts cited in the report questioned the use of roundabouts, describing them as an obsolete design feature, and said the proposals appeared to have been prepared without sufficient scientific assessment of traffic patterns.
The concerns extend beyond individual road dimensions. One expert quoted in the report said land use and transportation should be planned together. The expert said the government had prepared plans for new roads without first preparing a land-use plan or conducting origin-destination studies, which examine where trips begin and end and how people move through the city.
Such studies are important to understanding whether a proposed road responds to existing travel demand, supports planned development or simply adds another connection to an already fragmented network. Without that evidence, the suitability of a road width or junction design becomes more difficult to assess. The report does not provide traffic counts, collision data or detailed engineering evaluations for the roads mentioned.
The timing of the road circulation map is another concern raised by the report. It was published before the Directorate of Urban Land Transport (DULT) completed its report on Bengaluru’s Comprehensive Mobility Plan. That plan is expected to examine transport solutions for the city.
The sequence places the road map ahead of a broader mobility assessment that could provide evidence on travel patterns and transport priorities. It also highlights the coordination challenge facing Bengaluru, where multiple public agencies influence road development and urban expansion.
A consistent planning framework would need to clarify how road widths are selected, how junction designs are evaluated and how proposed links fit with land-use and mobility plans. The report does not indicate whether the GBA or BDA has announced revisions to the circulation map, nor does it record a formal response from the agencies to the concerns raised.
For residents, the issue is not limited to the appearance of a road map. Differences in design standards and unresolved connections can make the city’s road network harder to understand and coordinate. The immediate public-interest question is whether Bengaluru’s future roads will be finalised through agency-specific plans or aligned with a completed mobility strategy and common design standards.


