Traffic through Sinhagad Ghat near Pune was brought to a standstill on Wednesday after a 12-wheeler truck became stuck at the sharp bend known as 11,000 Point, narrowly avoiding a possible fall towards the valley, according to a report by Sakal – Pune. A crane was being used to remove the vehicle, while queues formed on the route used by local residents and tourists.
The truck was travelling from Satara towards Pune through the Khed-Shivapur route when it became stranded at the difficult bend. The stretch has a narrow carriageway, winding turns and steep gradients, making it difficult for heavy vehicles to negotiate the road. The truck reportedly reached the edge of the valley after getting stuck, but the driver’s alertness prevented a more serious incident.
The vehicle blocked movement through the ghat, leaving traffic from both directions in queues. Tourists travelling to the Sinhagad area and local residents were reported to be facing congestion as efforts continued to pull the truck out. Security guards from the forest protection committee reached the site while the crane operation was under way.
The incident has again brought attention to the movement of heavy vehicles through Sinhagad Ghat. The route’s narrow geometry and sharp bends create limited space for large trucks to turn or pass, particularly on sections with steep climbs and descents. The report said heavy vehicles had previously caused traffic obstructions and accidents in the ghat.
Following earlier incidents, Haveli police, the forest department and the transport department had inspected the ghat, according to the report. The inspection found the route dangerous for heavy vehicles. Despite that assessment, heavy-vehicle traffic has continued on the road.
The latest obstruction has raised questions about how restrictions and traffic controls are being enforced on a route that combines local access, tourist movement and forest-area terrain. The supplied report said the ghat’s physical characteristics and the risks created by heavy vehicles require traffic regulation, but that firm measures had not been implemented after the earlier inspection.
The immediate priority at the site remained removing the truck and restoring movement through the ghat. Rural police, the forest department and transport authorities are the agencies identified in the report as being involved in the route’s inspection and traffic-management concerns.


