Passengers using Putlur railway station in Tiruvallur district have urged Southern Railway to improve basic amenities and add infrastructure, including a fourth platform, additional shelters, a subway and a long-pending lift.
The demands were submitted to the Divisional Railway Manager of the Chennai Division in a representation by resident Raghavendra Bhat Kadekar. The representation lists 11 requests, with the fourth platform described as a key requirement for commuters travelling between Tiruvallur and Chennai and workers heading to the Kakkalur SIDCO Industrial Estate.
Kadekar said fast local trains had previously stopped at Putlur, allowing commuters to travel more conveniently towards Chennai. According to the representation, those trains now run on the fast line and pass through the station without stopping.
Passengers have also raised concerns over the absence of a lift despite its sanction nearly three years ago. Other requests include additional shelters on platforms 2 and 3, roof cover for the old foot overbridge, CCTV monitoring from Tiruvallur Railway Protection Force instead of Annanur, public announcement and train display systems, and a subway on the western side of the station.
The demands point to access and interchange limitations at a suburban station serving both residential commuters and workers travelling to an industrial estate. A fourth platform could provide additional operational space, while a western-side subway could improve access for passengers approaching the station from that side. The Railways, however, has said the subway proposal would require an inspection and a feasibility assessment based on soil conditions and passenger footfall.
A Southern Railway official said drinking water taps and toilets were available at the station, but acknowledged that their maintenance was not satisfactory. The official also said the public announcement system was serviceable and would be revamped soon.
The condition and distribution of passenger facilities remain central to the representation. Additional platform shelters have been sought on platforms 2 and 3, while the requested roof cover for the old foot overbridge is intended to improve protection for passengers using the existing crossing. The lift demand remains pending, according to commuters.
The representation comes as Putlur passengers seek improvements that would address both everyday station access and the availability of train services. Southern Railway’s response currently includes a proposed revamp of the announcement system and a feasibility review for the western-side subway. The remaining demands, including the fourth platform and lift, will require further action from the Chennai Division.


