A 180-metre musical fountain and light-and-sound installation has been completed at Ganesh Ghat on Mumbai’s Powai Lake at an approximate cost of Rs 30 crore, according to a report by Navbharat Times. The project is scheduled to be inaugurated at 7 pm on Sunday by Maharashtra Cabinet Minister Mangal Prabhat Lodha.
The Powai Lake musical fountain includes a water screen, laser projections and 27 fire jets. Its water streams are planned to reach a height of about 40 metres, while music, lighting and water movements will form the central audiovisual attraction.
The show will use three films to present the history of the Marathas, Maharashtra’s culture and Mumbai’s development journey. The stated objective is to connect younger audiences with the state’s history and cultural heritage and to develop Mumbai as a new tourism destination.
The project has been funded through the Mumbai Suburban District Planning and Development Committee, while the Maharashtra Housing and Area Development Authority (MHADA) carried out the construction, the report said.
Three shows are planned each day over approximately three hours. The report said the fountain would circulate around 30 lakh litres of water daily while adding air to it, with the department expecting this to help increase dissolved oxygen in the water. This is presented as an expected benefit rather than independently verified water-quality data.
The project will use LED lighting directed upwards from the water surface. The concerned department said care had been taken to avoid harming aquatic life and that sound levels would be kept within prescribed decibel limits. The report did not provide details of an independent environmental assessment or monitoring framework.
Operational facilities are reported to include a control room, CCTV surveillance, fire-fighting equipment, trained staff, security guards, first-aid services, backup power through a diesel generator set, plastic chairs and wheelchairs. The tender reportedly includes comprehensive maintenance and repair for three years and operation of the facility for five years after completion.


