NTPC-SAIL Power Company Limited has invited online bids to build a 25 MW grid-connected, ground-mounted solar photovoltaic project at Nandini airstrip in Bhilai, Chhattisgarh, Renewable Watch reported. The bid submission deadline is December 7, 2026.
The engineering, procurement and construction contract will cover the design, engineering, manufacture, supply, transportation, installation, testing and commissioning of the solar plant. It will also include a 132 kV power evacuation system to the Chhattisgarh State Power Transmission Company Limited’s Ahiwara substation and construction of a new 132 kV bay.
The scope includes site preparation, module mounting structures, a central monitoring and control station, supervisory control and data acquisition systems, closed-circuit television monitoring, a module washing system and metering. The selected contractor will also be required to provide mandatory spares, train personnel and operate and maintain the solar plant and 132 kV system for three years.
Because the project is planned at an airstrip, the tender requirements include compliance with Airports Authority of India guidelines and Aviation Base Bhilai requirements. Bidders must also account for recommendations from a glint and glare study, which assesses potential visual impacts of reflected sunlight on aviation operations.
The tender requires bidders to submit an earnest money deposit of Rs 20 million. Financial eligibility criteria include a standalone average annual turnover of at least Rs 1,160 million during the preceding three financial years. Applicants must also have a net worth of at least 25 per cent of paid-up share capital at the end of the preceding financial year and no more than 30 per cent erosion in net worth over the previous three financial years, subject to the alternative condition specified in the tender.
For technical eligibility, bidders must have designed, supplied, erected and commissioned, or developed, grid-connected solar photovoltaic plants with at least 20 MWp of cumulative capacity. This must include at least one plant of 10 MWp or more that has been operational for a minimum of six months.
The tender also allows eligibility through experience as a developer or engineering, procurement and construction contractor for an industrial project in sectors including power, steel, oil and gas, petrochemicals, fertilisers, cement or coal mining. Such experience must involve a project valued at least Rs 1,160 million, along with at least one 33 kV-or-higher electrical substation, with both operational for at least one year.
The project will therefore combine new solar generation with dedicated high-voltage evacuation infrastructure. The next stated milestone is the December 7 bid deadline, after which the procurement process can move towards selection of the EPC contractor.