HomeBreaking NewsJalgaon tunnel closure begins November 23 for flyover work

Jalgaon tunnel closure begins November 23 for flyover work

A tunnel near B. U. N. Raisoni School in Jalgaon will be fully closed to traffic from Monday, November 23, to enable foundation work for a railway flyover, according to a report by Loksatta. The closure will affect vehicles travelling towards the Pimprala area.

The decision has been taken by the Jalgaon City Municipal Corporation as construction activity begins near the railway corridor. The flyover is being built by the Maharashtra Rail Infrastructure Development Corporation Limited (MRIDC).

The administration said the closure is intended to protect motorists and residents from risks associated with construction activity at the site. The project is also expected to support smoother movement across the railway line and reduce traffic pressure on the highway, the report said.

Vehicles heading towards Pimprala have been directed to use an alternate route. From near B. U. N. Raisoni School, motorists should turn right, cross the highway near Navjeevan, and continue via the road in front of the Hyundai showroom through Bendale Nagar before reaching Pimprala.

The municipal administration has appealed to motorists not to insist on using the closed tunnel and to follow the designated diversion. The alternate route is intended to keep daily movement to Pimprala operating while foundation work is under way.

The report does not specify how long the tunnel will remain closed. Motorists using the area from November 23 should therefore allow for the diversion and follow on-site traffic directions around the construction zone.


RELATED ARTICLES

Most Popular

Latest News