The Bengaluru government has announced a comprehensive development plan for Central Silk Board Junction, combining traffic improvements, drainage works, public amenities and the redevelopment of space beneath the flyovers. Greater Bengaluru Development Minister Krishna Byre Gowda said the junction would receive a permanent development plan as part of the ‘Ward One’ campaign being launched across 43 wards in five city corporations from November 1.
The minister inaugurated the campaign at Central Silk Board Junction on Saturday by painting the flyover pillars. He said civic authorities and voluntary organisations had already undertaken several improvement works at the junction, where thousands of people travel every day. The new campaign will prioritise the development of major junctions, with measures aimed at easing traffic and improving the appearance and usability of public spaces.
The proposed works include cleaning and landscaping the areas beneath the flyovers, along with seating and recreational facilities for residents and commuters. Byre Gowda directed officials to develop vacant land beside the stormwater drain as an island-style public space, with seating and shade. He also instructed them to install brush concrete in some soil-covered sections to help maintain cleanliness.
A public toilet is also planned at the junction to serve daily commuters. On the route from Electronic City towards BTM Layout, officials were asked to install a steel grid over the stormwater drain to improve vehicle movement and facilitate a free-left turn. The proposal addresses a section of the junction where traffic flow, drainage infrastructure and pedestrian-oriented facilities overlap.
The space under the flyover is also being redesigned for public use. In addition to painting the pillars and installing kerb stones, authorities are arranging seating areas. A throwball court is being constructed, while officials have been instructed to provide facilities for table tennis and other activities.
Drainage is another part of the proposed intervention. To address water-related problems on the stretch between Central Silk Board Junction and HSR Layout during rainfall, B-Smile is undertaking white-topping work. The minister directed officials to take steps to construct a new drain alongside that work. The announcement did not specify the cost, completion schedule or the agency responsible for executing each component.
The redevelopment beneath the flyover is being supported by CGI through its corporate social responsibility initiative, in association with the Bengaluru South City Corporation. The ‘Mysuru Silk’ concept and its implementation are being handled by India Rising Trust, a non-governmental organisation. According to the minister, the organisation has previously developed more than five areas beneath flyovers.
The plan places Central Silk Board Junction within a wider civic strategy that treats high-traffic intersections not only as points for vehicle movement but also as locations requiring drainage, sanitation, shade, seating and recreational facilities. The next stages will depend on the preparation of the permanent development plan and the implementation of the proposed traffic, drainage and public-space works.


