Shri Shikshayatan School’s expansion in central Kolkata is more than a campus upgrade. It is an example of how institutions in dense city areas are responding to scarce land: by acquiring nearby plots, separating primary and senior-school functions, and reconstructing existing classrooms instead of moving the entire operation to the urban periphery.
The school, founded in 1954 on Lord Sinha Road, has added a second campus four houses away for its primary section. The campus began operating fully in April this year, according to the school’s secretary general, Vinod Agarwal. The new arrangement gives the school additional space while allowing it to remain in the central city, where land availability is a major constraint.
That constraint is central to understanding the decision. Agarwal said the school had been looking for more space for students and described the availability of a nearby plot as an opportunity because “in entire central Calcutta, land is scarce”. The location of the new primary campus, close to a Metro station, also gives the expansion a transport advantage for students, parents and teachers.
The choice matters because schools in central Kolkata face a difficult spatial equation. They need larger classrooms, laboratories and activity spaces, but their campuses are surrounded by established neighbourhoods, commercial areas and older buildings. Moving to a new site farther from the central business district can provide land, but it can also lengthen daily journeys for families and staff. Shri Shikshayatan’s expansion keeps the primary section close to the original campus rather than shifting the institution away from the city centre.
### Expansion without a peripheral relocation
The primary campus operates from two buildings spread across 20 cottahs and serves 1,750 students from Kindergarten to Class V. The school’s decision to place the primary section in a separate nearby campus allows the original building to be reorganised for older students. This is a form of internal spatial restructuring: instead of treating the existing campus as fixed, the school is changing how different age groups use its buildings.
According to Agarwal, the school has obtained 44 classrooms in total. Classrooms vacated by primary students in the original building are being reconstructed for senior students. Smaller rooms will be converted into larger classrooms equipped with digital facilities and modern furniture. The expansion will also make room for more spacious laboratories and new specialist facilities.
This approach reflects a broader challenge for institutions operating in mature urban districts. New construction is not always the only way to add capacity. Reassigning spaces, acquiring adjacent land and upgrading existing buildings can together create additional room without abandoning a centrally located campus. The model is particularly relevant in areas where large, vacant plots are difficult to find.
The school’s expansion therefore combines two kinds of development. The first is outward, through the additional campus acquired nearby. The second is internal, through the reconstruction and reallocation of space in the original school building. Neither element alone would fully address the school’s requirements. Together, they allow the institution to increase usable capacity while retaining its established location.
### The Metro connection is part of the campus logic
The proximity of the new primary campus to a Metro station is not a peripheral detail. For an urban school, accessibility determines how easily students and staff can reach the campus, particularly when the institution operates across more than one building.
A central location can reduce the need for a school to depend entirely on private vehicles or long-distance bus journeys. It can also make the campus more accessible to teachers and parents travelling from different parts of the city. The source material does not provide travel figures or details of the station, so the effect of the Metro connection cannot be quantified. But the school’s management has identified the proximity as a benefit for students, parents and teachers.
The arrangement also creates a practical relationship between education infrastructure and public transport. When a school remains close to an established transit network, the institution can expand without making a new location’s accessibility an additional problem. That is especially significant in a central district, where road space and parking are already limited, although the school has not provided details of its traffic or parking arrangements.
The two-campus model will require coordination as well. Primary and senior students will occupy separate sites, while the institution will continue to function as one school. The supplied information does not establish how administration, movement of staff, shared facilities or emergency arrangements will be managed. Those operational details will determine how effectively the spatial expansion works in practice.
### Laboratories point to a change in educational space
The most significant change inside the original campus may be the planned expansion of science facilities. The school currently has two sections of science. The additional space is intended to create larger physics, chemistry and biology laboratories, as well as a tinkering lab.
Agarwal said the bigger laboratories will accommodate more students and allow them to perform experiments simultaneously. That indicates a shift from classrooms designed mainly for routine teaching towards spaces that support practical and collaborative learning. The school has also stated that it wants to promote science education among girls and encourage more girls to choose science.
The physical requirements of such teaching are different from those of a standard classroom. Laboratories need more floor area, equipment and specialised layouts. A tinkering lab also requires room for hands-on activity. By converting smaller classrooms and using additional space for these facilities, the school is linking its construction programme to a stated educational objective rather than adding space without a defined use.
However, the available information does not establish the size of the laboratories, the equipment being installed, the cost of the work or the number of students expected to use them. It confirms the intended facilities and their broad purpose, but not their final capacity or operational performance. Those details will be important for assessing whether the expansion produces a proportional improvement in access to practical science education.
### What the project says about central Kolkata
The school’s expansion highlights a wider urban tension: central locations remain valuable, but their physical capacity is difficult to increase. Established institutions often possess strong locational advantages, including proximity to public transport and existing residential catchments. At the same time, they may operate from buildings planned for an earlier scale of enrolment and an earlier model of teaching.
In such settings, relocation can appear to be the simplest answer. A school can move to a larger site in a less constrained area, but that decision changes the institution’s relationship with its students and staff. It can increase travel distances and separate the school from the neighbourhoods it has served for decades. Shri Shikshayatan’s decision, as described by its management, represents a different response: retain the central campus, find space nearby and reorganise the existing buildings.
The approach is not automatically transferable to every school. It depends on the availability of an adjacent or nearby plot, the ability to finance reconstruction and the feasibility of operating more than one building. The source material confirms that other schools in the city centre have expanded but moved farther north or towards the EM Bypass area. It does not provide comparative figures on their enrolment, land holdings or travel patterns, so the relative efficiency of the different models cannot be established.
What can be established is the importance of land strategy. For schools in built-up districts, expansion is not only an educational decision. It is also a question of urban land use, transport access and the continued presence of institutions within central neighbourhoods. The project shows how a school can treat nearby land and existing buildings as parts of one larger campus system.
The additional facilities are expected to be ready for use by the next academic session, which starts in April, according to Agarwal. Until then, the key developments to monitor are the completion of the reconstructed classrooms, the operationalisation of the larger laboratories and the effectiveness of the two-campus arrangement for the school’s 1,750 primary students and its senior sections. The evidence currently supports a clear conclusion: in land-constrained central Kolkata, expansion increasingly depends on proximity, reuse and careful reorganisation rather than on a single large new site.


