HomeBreaking NewsResilient Lanka Project Wins Kerala Backing to Tackle Coastal Flooding

Resilient Lanka Project Wins Kerala Backing to Tackle Coastal Flooding

Kerala Chief Minister V.D. Satheesan has announced full state support for the Resilient Lanka project, a pilot initiative in Ezhikkara aimed at addressing the coastal flooding and tidal inundation affecting communities in the panchayat. The project was inaugurated in Ezhikkara and is the first of its kind to be implemented on a pilot basis in the state.

The initiative has been designed in response to rising sea levels and the movement of tidal water through rivers and backwaters into inhabited areas. According to the Chief Minister, the project seeks to develop long-term solutions for coastal communities facing these recurring problems.

EQUINOCT has been assigned responsibility for implementing the project, while the Happiness Project is providing financial support. The project’s design combines scientific research with the experiences and traditional knowledge of local residents, who are expected to remain involved through continuing consultations.

Satheesan said the project was intended to turn research findings into practical solutions for everyday problems. If the Ezhikkara pilot succeeds, the state will support its expansion to other areas facing similar tidal flooding and waterlogging challenges, he said. The government would also support the preparation of a statewide programme for this purpose.

The announcement places local knowledge and scientific research at the centre of a coastal resilience effort, while also linking the pilot to infrastructure planning in Ezhikkara. The panchayat is progressing with bridge construction to connect isolated settlements in the area. These connections are intended to improve access for communities that remain separated from the wider local network.

Ezhikkara is also planning a tourism road along the backwater edge, with the aim of developing the area as a major tourism destination. The Chief Minister said development activities would be undertaken while protecting paddy fields and natural resources.

The project therefore combines three strands of local planning: responding to tidal flooding, improving connections between settlements and using the area’s backwater setting for tourism. The source report does not specify the project’s budget, construction schedule, engineering interventions or measurable performance targets.

The inauguration was attended by Ezhikkara gram panchayat president Seena Sajeev, district panchayat president K.G. Radhakrishnan, Paravur block panchayat president P.R. Saijan, district panchayat standing committee chairman Shaijo Parambi, panchayat vice-president C.M. Rajagopal and district panchayat members Mary Vincent and Bindu George. Representatives of EQUINOCT, the Happiness Project, the Kerala University of Fisheries and Ocean Studies, the State Biodiversity Board and the State Planning Board also participated.

The immediate next step is the implementation of the Ezhikkara pilot, after which its results will determine whether a similar approach is extended to other locations facing tidal flooding and waterlogging across Kerala.


RELATED ARTICLES

Most Popular

Latest News