Narayan lake water supply tender in Vengurla municipal council area
Narayan lake water supply tender in Vengurla municipal council area invites bids for key water infrastructure works.
The Municipal Council of Vengurla in Maharashtra, under the Directorate Of Municipal Administration and Municipal Administration, Sindhudurg, has published an active tender for civil works related to water supply infrastructure. This tender encompasses the construction of a protective wall around Narayan lake, which is a key water source supplying drinking water to the city. Additionally, it includes the extension of the water supply pipeline and the removal of silt from Narayan lake to maintain its functionality and water quality. The scope of work aims to ensure the sustained supply of water to residents of the Vengurla municipal council area. The contract type is based on percentage, with an estimated work period of 360 days. An earnest money deposit (EMD) of ₹760,833 and a tender fee of ₹10,000 are required for participation. Key dates include publication on October 20, 2026, with closing on November 4, 2026, and a pre-bid meeting scheduled for October 27, 2026. The tender does not provide an estimated project value but is critical for maintaining and improving water infrastructure within this jurisdiction.
| Tender ID | 2026_DMA_1345917_1 |
|---|---|
| Tender Reference | No/VMC/e-Nivida/4231/2026 eTender No.26 |
| Issuing Authority | Government of Maharashtra |
| Authority Type | Government |
| Project Category | Water Supply |
| Location | Vengurla, Maharashtra |
| Estimated Value | NA |
| Citizen Benefit | Improved water supply infrastructure and protection of Narayan lake |
| Contract Type | Percentage |
| Submission Deadline | 2026-11-04 |
| Pre-Bid Meeting | 2026-10-27 |
| Document Fee | 10,000 |
| EMD | 760833 |
| Issued Under Scheme | Standalone |
| Tender Portal Link | Not stated |
Narayan lake serves as a vital water supply source for the city of Vengurla. The tendered works are essential for protecting this natural resource by constructing a protective wall that will help safeguard the lake’s surroundings and prevent damage or contamination. Extending the water supply pipeline ensures better distribution and possibly increased capacity to meet the city's water demand. Removal of accumulated silt from the lake is a crucial maintenance activity that can improve water quality and reservoir capacity, ensuring reliable water availability for domestic and municipal needs. These infrastructure improvements directly support the sustainability and resilience of the city’s water supply system, which is fundamental for daily life, public health, and urban living standards in the Vengurla municipal council area.
For informational purposes only. Urban Acres Tender Watch is a neutral government tender information service. Verify all details on the official tender portal.


