The Mumbai Metropolitan Region Development Authority has commenced trial runs on a vital 5.3-kilometre stretch of the long-anticipated Metro Line 2B, connecting Mandale to Diamond Garden.
This operational trial, spanning five key stations including Mankhurd and Shivaji Chowk, marks a turning point for commuters who have long relied on overburdened roadways and congested suburban trains for cross-city travel. The 18.5-kilometre Metro 2B corridor, stretching from DN Nagar in the west to Mandale in the east, has endured delays linked to land acquisition, funding bottlenecks, and the COVID-19 pandemic. However, with the completion of the Mandale depot—a sprawling double-decked facility built over 31 acres and capable of accommodating up to 72 trains—the project now appears to be gaining steady traction. This latest phase of dynamic testing will evaluate key technical parameters such as braking performance, acceleration control, power consumption, signalling systems, and telecommunications reliability, all of which are prerequisites to ensure system safety and seamless integration.
Following successful internal trials, the system will undergo rigorous scrutiny by the Research Design and Standards Organisation under Indian Railways, whose assessment will determine the project’s operational readiness. If cleared, certification by the Independent Safety Assessor will follow, paving the way for eventual public rollout. While the full stretch from DN Nagar to Mandale was initially slated for completion by December 2025, implementation timelines have now been pushed to early 2026 for key sections such as Diamond Garden to DN Nagar. The change is being seen as a calculated step by MMRDA to prioritise safety and infrastructure integrity over hurried deadlines.
For urban mobility experts and sustainability advocates, Metro 2B represents more than just improved commuting. It signals a deeper commitment to low-emission public transport solutions in India’s most densely populated city. With Line 2A (Dahisar to DN Nagar) already in operation and receiving encouraging public feedback, Metro 2B’s integration will offer a seamless link between residential and commercial districts of Chembur, Kurla, Bandra East, and Andheri. These regions, often plagued by vehicular congestion and inadequate last-mile options, are now looking forward to reduced travel times and increased economic activity. The corridor is also expected to spur micro-local real estate growth, especially around station zones, by enhancing ease of access and decongesting traditional routes like the Eastern Express Highway and the Harbour Line.
Urban planners see this revival of trials as a strategic milestone for the MMRDA, given the agency’s renewed focus on building equitable and climate-resilient transport infrastructure. With the Mandale depot now energised and infrastructure work accelerating, the city’s vision of an integrated metro network is slowly inching closer to reality. For lakhs of daily commuters braving long hours in traffic or packed trains, the metro’s promise of accessibility, speed, and sustainability offers not just convenience—but a vision of what urban India must become.
Also Read :https://urbanacres.in/mumbai-metro-ibs-proposal-faces-backlash/
Mumbai Metro Line 2B trials begin between Mandale and Diamond Garden stations
Visited 3 times, 1 visit(s) today