The Mumbai Metropolitan Region Development Authority (MMRDA) has presented a proposal for an integrated 31-km road tunnel system and reviewed the alignment of the proposed Uttan-Bhayandar-Virar sea link as part of efforts to improve connectivity across the region.
The proposals were presented to Maharashtra Chief Minister Devendra Fadnavis at a meeting held on November 19 at his official residence, Varsha, according to a report by the Free Press Journal. Senior officials from the state urban development department, MMRDA, the Brihanmumbai Municipal Corporation, Thane Municipal Corporation and Mumbai Police attended the meeting.
The proposed tunnel system, described in the report as a one-way stretch of approximately 31 km and also referred to as ‘Patal Lok’, is planned to connect several major transport corridors and destinations. These include the Bandra-Worli Sea Link, the Bullet Train station in the Bandra-Kurla Complex, Dharavi, BKC, Terminal 2 of Chhatrapati Shivaji Maharaj International Airport, the Western Express Highway and the Eastern Express Highway.
According to MMRDA, the tunnel network would provide direct connectivity between Mumbai’s eastern and western express highways, BKC and the airport. The authority said the proposal is intended to reduce travel time across key parts of Mumbai and support the wider ring road network planned for the Mumbai Metropolitan Region.
The meeting also reviewed two alignment options for the Uttan-Bhayandar-Virar sea link, which had received approval earlier. The link is intended to improve connectivity between Mumbai and the upcoming Vadhavan port through the proposed Mumbai-Vadhavan expressway network.
MMRDA said the two projects would strengthen links within the proposed regional ring road system and enable faster movement across the metropolitan area. The report does not provide project costs, construction timelines, land-acquisition details, environmental approvals or a final decision on the revised sea-link alignment.
The proposals remain at the planning and review stage, with further technical, administrative and implementation details yet to be disclosed.


