The Karnataka Cabinet has approved white-topping works on 88 roads covering 130.85 km in Bengaluru at an estimated cost of ₹2,321.17 crore, according to Deputy Chief Minister G. Parameshwara.
Parameshwara said at a press conference that the works would be undertaken through B-SMILE in 12 packages. White-topping involves constructing a concrete pavement over an existing road surface and is intended for sections requiring longer-lasting carriageway treatment, although the source report does not provide details of the roads selected, construction schedule or traffic-management arrangements.
The Cabinet also approved changes to the funding structure for elevated corridors from Yeshwanthpur to Old Madras Road and from Marenahalli Main Road to Kanakapura Road. The state government and Bengaluru’s municipal corporations will share the funds required for implementing those projects equally, the report said.
Separately, the government approved a revised estimate of ₹486.79 crore for a B-SMILE project to design and develop the route from Silk Board Junction to the K.R. Puram Metro station and the Outer Ring Road to global standards. The state government and Bengaluru’s municipal corporations will again bear the cost equally.
The Cabinet’s decisions come alongside other Bengaluru urban approvals reported by Prajavani. These include administrative approval for a revised estimate of ₹1,379.62 crore for 10 waste-management packages covering wet waste, dry waste, construction waste and road-sweeping waste within the Greater Bengaluru Authority area.
The Cabinet also approved the second phase of a commercial complex and multiplex being built by the Karnataka Housing Board on 2 acres and 18 guntas in Survey No. 20/8 at Valagerahalli in Kengeri. That work is estimated to cost ₹68.50 crore.


