HomeBreaking NewsKalahandi School Gets ₹6 Lakh, Six Classrooms Remain Unsafe

Kalahandi School Gets ₹6 Lakh, Six Classrooms Remain Unsafe

A government upper primary school in Dumeramunda village of Odisha’s Kalahandi district is operating with six classrooms reported to be in a dilapidated and unsafe condition, even as construction work begins on some basic facilities under a ₹6 lakh grant.

The school, located in Shirol gram panchayat under Kesinga block, was established on 3 February 1962 and currently has 129 students, including 16 children in Shishu Vatika. The six classrooms serve students from Shishu Vatika to Class VIII, with three rooms used for Classes I to V and three for Classes VI to VIII.

According to Dharitri’s report, the walls and roofs of the classrooms have deteriorated after decades of use. The school also lacks additional classrooms needed for its enrolment. The report said the boundary wall, kitchen and toilets had weakened or collapsed after being built with mud-based construction and being exposed to rain.

Kesinga Block Development Officer Janmejaya Swain told the publication that ₹6 lakh had been sanctioned for constructing the boundary wall, kitchen and toilets. An additional executive engineer, Subash Nayak, inspected the school on the BDO’s instructions. Work on those facilities is under way, while the required classrooms are expected to be constructed in phases, according to the report.

The school has also reported inadequate drinking water. Its old tubewell provides only a small quantity of water, creating difficulties for students and for preparing mid-day meals. The existing toilet is reportedly unusable, forcing students to go outside.

The report also cited the movement of elephant herds and wild boar near the school. It said a woman had died in a wild-boar attack in the area several years ago, increasing the demand for a protective boundary around the campus.

Headmaster Surendra Kumar Dora and school committee president Jamurlajun Sahu had submitted written complaints to the Kesinga BDO and the block education officer regarding the school’s condition. The report did not specify a completion date for the new facilities or the proposed classroom construction.


RELATED ARTICLES

Most Popular

Latest News