India’s potential 1 per cent of GDP productivity gain from better maintenance is not primarily a technology story. It is a story about how the country uses, operates and protects the industrial equipment and infrastructure it has already built. At MRAM Expo 2026, industry leaders argued that reducing breakdowns, unplanned downtime, inefficient asset use and premature replacement could recover substantial economic value. The claim places maintenance at the centre of India’s infrastructure and industrial growth challenge, rather than treating it as a back-office operating expense.
The immediate evidence is stark. An ABB global survey cited at the expo found that 88 per cent of Indian industrial businesses experienced an unplanned outage at least once a month, compared with 69 per cent globally. The survey estimated the cost to a typical Indian business at nearly Rs 70 lakh per hour. Nineteen per cent of Indian respondents still relied on run-to-fail maintenance, a model in which equipment is operated until it breaks before repairs or replacement are undertaken.
These figures describe a private-sector industrial problem, but their implications extend well beyond factories. Roads, bridges, railways, airports, ports, power plants, water systems and other urban infrastructure also depend on the regular inspection, monitoring and servicing of physical assets. When these systems fail, the cost is not limited to a repair invoice. It can include interrupted production, delayed freight, disrupted commuter journeys, lost working hours, service outages and the need for repeated capital spending.
That is the central shift in the maintenance debate: the question is no longer only whether an asset is operational today. It is whether the asset is delivering the expected service, at an acceptable cost, for the longest practical period. A bridge that remains open but requires repeated emergency interventions, a power system that frequently trips, or a water installation that operates below capacity may all be counted as existing infrastructure while still imposing significant economic losses.
The MRAM Expo discussion described a movement away from reactive, run-to-fail maintenance towards predictive, data-driven and reliability-centred systems. Predictive maintenance uses information about equipment condition to identify potential failures before they interrupt operations. The supplied report also referred to digital twins, remote monitoring and automated substation operations as tools that can support this shift. However, the evidence presented does not establish that technology alone will deliver the claimed GDP opportunity. It shows instead that these tools are being positioned as part of a broader change in how assets are managed.
The institutional challenge is important. Asset maintenance is often separated from the decisions that create or procure the asset. Capital expenditure can receive greater attention than the long-term cost of operation, servicing and renewal. The report does not provide a detailed account of procurement rules, municipal budgets or the division of responsibility among infrastructure agencies. It does, however, point to a familiar structural tension: large investments in physical assets can lose value when the systems needed to maintain them are weak or reactive.
Amit Gupta, Division President, Motion Services, ABB India, said the industry frequently underestimates the consequences of unplanned downtime. Martin Robinson, Founder and CEO of IRISS Group, USA, described better maintenance as a direct driver of productivity and economic growth, linking it to higher uptime, fewer breakdowns, longer asset life, lower operating costs and less waste. These statements frame maintenance as an economic function rather than merely a technical one.
The scale of the potential loss is also reflected in the wider figures cited at the expo. Siemens research estimates that unplanned downtime across the Fortune Global 500 costs companies about USD 1.5 trillion annually, equivalent to around 11 per cent of revenues. That comparison concerns large global companies and cannot be directly treated as a measure of India’s own losses. It does, however, indicate how interruptions to industrial systems can become a macroeconomic issue when repeated across a large asset base.
The Indian numbers point to a particularly large exposure. If 88 per cent of surveyed industrial businesses experience at least one unplanned outage each month, the issue is widespread rather than confined to a few poorly managed facilities. The estimated cost of nearly Rs 70 lakh per hour for a typical Indian business also shows why even short interruptions can affect production economics. The report does not state how the survey defined a typical business, how many companies were included or how the estimate varied by sector. Those details matter when translating the headline figure into a national estimate.
The same caution applies to the 1 per cent GDP opportunity. The figure is presented by industry leaders as the value that could potentially be unlocked by reducing losses from equipment breakdowns, downtime, inefficient assets and premature replacement. It is an opportunity estimate, not a confirmed addition to national output. The supplied material does not specify the methodology used to calculate it. Its significance therefore lies in the scale of the maintenance gap it is intended to represent, rather than in treating 1 per cent as a guaranteed economic gain.
The market for asset performance management reflects the growing commercial and policy interest in this gap. The Indian Asset Performance Management market was estimated at USD 810.6 million in 2024 and is projected to reach USD 2.25 billion by 2033, representing a compound annual growth rate of around 12 per cent, according to figures cited by MRAM Expo convenor Anitha Raghunath, Founder and Managing Director of Virgo Communications. Asset performance management typically combines monitoring, maintenance planning and operational data to improve the performance and life of equipment.
This projected market expansion does not automatically mean that public infrastructure will become more reliable. A larger market can supply more tools and services, but outcomes depend on whether asset owners have usable data, trained personnel, maintenance budgets, clear performance standards and authority to act on warnings before a failure occurs. The report provides no evidence on how widely such systems are currently deployed across Indian cities or public agencies. That gap is itself relevant: a technology market can grow faster than institutional capacity to use it effectively.
Policy support is beginning to recognise maintenance as part of infrastructure resilience. The report said a NITI Aayog report on AI for Viksit Bharat recommends AI-based predictive maintenance, digital twins, automated substation operations and remote monitoring. These recommendations place asset intelligence within a wider national technology and infrastructure agenda. They also indicate that maintenance is increasingly being considered during the operational life of an asset, not only at the point of construction or commissioning.
For urban authorities, the implications are practical. A city’s infrastructure network is made up of interdependent systems: transport, electricity, water, drainage, public buildings and communications. Failure in one system can increase pressure on others. Yet the supplied evidence does not establish a single national maintenance framework for these assets, nor does it show that city agencies share data or use common performance measures. Responsibility remains distributed across different authorities and operators, making coordination as important as the availability of sensors or software.
The maintenance question also changes how infrastructure investment should be assessed. Building more assets expands capacity, but preserving the performance of existing assets can offer another route to improving services. Longer asset life can delay replacement, while fewer failures can reduce the disruption associated with emergency works. The MRAM discussion links both outcomes to lower operating costs and reduced waste. It does not quantify the savings for Indian public infrastructure, so the exact fiscal benefit remains unestablished in the supplied material.
What the evidence confirms is that maintenance failure has consequences at three levels. At the firm level, it interrupts output and raises operating costs. At the infrastructure level, it shortens asset life and can force premature replacement. At the economy-wide level, repeated downtime can reduce the value generated by industrial and public capital. The evidence does not confirm that predictive maintenance will by itself unlock 1 per cent of GDP, but it does support the argument that avoidable asset failure is a significant productivity concern.
The larger urban question is whether India can move from measuring infrastructure success by construction and commissioning to measuring it by reliable service over time. The source material points towards predictive systems, artificial intelligence and asset performance management as tools in that transition. What remains unclear is how these tools will be funded, governed and integrated into the daily work of industrial and public agencies. Those implementation questions will determine whether the maintenance opportunity remains an industry estimate or becomes a measurable improvement in the performance of India’s built environment.


