The Dantiwada Dam in Gujarat has released 500 cusecs of water into canals for winter irrigation, providing one round of watering to about 16,000 hectares of rabi crops in Banaskantha and Patan districts, according to a report by Nav Gujarat Samay.
The release was made on November 19 after farmers sought irrigation water for crops including mustard, castor, fennel, cumin and wheat. The water has reached canals in the Gadh area, where farmers reportedly welcomed the supply and performed a ceremonial greeting for the canal flow.
The release comes as the region faces pressure on its irrigation reserves. Banaskantha includes desert and hilly areas and has experienced recurring water shortages in years of inadequate rainfall. The report said the previous monsoon brought little inflow to the Dantiwada reservoir, while the Sipu and Mukteshwar dams also received limited water.
Nav Gujarat Samay reported that the Dantiwada reservoir was at a water level of 565 feet, with storage at about 20 per cent. Because of the constrained reserves, the dam is expected to provide only one irrigation cycle for the current winter sowing, after which the release will be stopped.
The limited supply creates a risk for farmers who have already invested in seeds and planted their crops. The report said farmers have called for Narmada water to be released into the canal network so that the standing crops can receive timely irrigation beyond the initial cycle.
The episode highlights the dependence of the region’s agricultural economy on coordinated reservoir and canal operations. A single release can protect crops across a large command area, but low reservoir storage restricts how long the system can sustain irrigation. The immediate benefit of the 500-cusec discharge is therefore significant for the reported 16,000 hectares, while the broader water requirement remains unresolved.
The report did not provide details on the volume of water released in total, the duration of the discharge, or any confirmed decision on supplementary Narmada water. Those details will be important in assessing whether the canal network can support the rabi crop through the remainder of the season.


