The Brihanmumbai Municipal Corporation has demolished 19 structures obstructing a proposed Development Plan road widening in Patilwadi, Dahisar, clearing a 70-metre stretch for construction of an 18.30-metre-wide road, according to a report by the Free Press Journal.
The existing road is barely four metres wide and has contributed to traffic congestion in the area. A senior civic official said the removal of the structures would improve connectivity around Mandapeshwar Caves, Loknete Gopinath Munde Udyan, Dahisar Gaothan and nearby schools, including JBCN School in Borivali and Mary Immaculate School.
The demolition operation used one JCB machine, two dumpers, five engineers and 16 workers, the report said. The BMC Roads Department has been instructed to expedite construction of a cement-concrete road and open the cleared stretch to traffic.
The work is intended to address a local bottleneck by creating substantially more road space along the affected section. However, the report does not provide details on the status of rehabilitation or compensation for occupants of the demolished structures, the project cost, or a target date for completing and opening the widened road.


