Ahmedabad’s 4-km-plus Sarkhej-ISKCON elevated corridor on the SG Highway is scheduled to open to the public on November 9, with Union Home and Cooperation Minister Amit Shah set to inaugurate the project, according to a report by Sandesh – Ahmedabad. The corridor has been built at an estimated cost of Rs 450 crore to reduce signal-related delays on one of the city’s important traffic routes.
The elevated structure is intended to provide a signal-free connection for vehicles travelling from Sarkhej towards Gandhinagar. According to the report, motorists using the corridor will not have to stop at intersections along the elevated route once it is opened for public use.
The project has been presented as a response to persistent traffic congestion on the Ahmedabad SG Highway. The report states that the corridor is more than 4 km long and was developed specifically to provide a permanent solution to traffic problems in the area. It does not provide details on the number of lanes, entry and exit points, traffic restrictions or the operating arrangements for vehicles using the elevated section.
Sandesh – Ahmedabad reported that the inauguration will take place on November 9 in the presence of Amit Shah. The report describes the project as a modern elevated corridor and said drone footage of the completed structure had appeared on social media, offering views of the infrastructure before its formal opening.
The corridor is expected to allow traffic travelling towards Gandhinagar to bypass signals on the route. The report said this could reduce travel time and fuel consumption for motorists and provide relief from traffic congestion. The scale of the benefit will depend on how traffic is distributed between the elevated corridor and the surface road network after the opening.
The project’s public impact will also depend on how local intersections, feeder roads and access points operate once the elevated route becomes functional. The supplied report does not specify whether the corridor will be open to all vehicle categories, whether any toll or access restrictions will apply, or how pedestrian and local traffic movements will be managed beneath and around the structure.
The scheduled inauguration marks the transition of the Sarkhej-ISKCON corridor from construction to public operation. Further details on traffic management, access arrangements and the formal operating schedule are expected to become available around the November 9 opening.


