HomeBreaking NewsAhmedabad Traffic Diversion Begins as Sindhubhavan Road Shuts for 48 Hours

Ahmedabad Traffic Diversion Begins as Sindhubhavan Road Shuts for 48 Hours

Ahmedabad Traffic Police have closed one side of Sindhubhavan Road in Bodakdev for 48 hours to support the installation of a heavy concrete pump and crane at the A Shridhar Wynn construction project. The restriction began at 11pm on November 3 and will remain in force until 11pm on November 5, requiring commuters to avoid the affected stretch and use alternative routes.

The closure covers the section from the turn towards Sterling Hospitals up to Sterling Hospital. According to the traffic arrangements issued for the work, the affected side of the road will remain completely closed during the installation activity.

The restriction has been imposed because cranes, concrete pumps and other heavy vehicles will be positioned on the road during the construction operation. Traffic authorities said the arrangement was made to reduce the risk of accidents and protect motorists and members of the public while the machinery is installed.

Sindhubhavan Road is located in one of Ahmedabad’s busiest and more developed areas, with regular movement of private vehicles and access traffic linked to nearby commercial, residential, healthcare and construction sites. The closure therefore affects traffic moving through the Bodakdev corridor, particularly during the 48-hour work window.

The traffic police have appealed to drivers to avoid the affected portion of Sindhubhavan Road and plan their journeys through alternative routes. The advisory is intended to help commuters avoid delays and reduce the possibility of congestion around the restricted area. The source report does not specify particular diversion roads.

The restriction is linked to a specific construction activity rather than a permanent change to the road network. The heavy equipment is being installed at A Shridhar Wynn, and the road is expected to reopen after the work is completed within the stated timeframe.

Temporary closures of this kind require coordination between construction sites and traffic authorities because large machinery can occupy road space, limit visibility and create safety risks for passing vehicles. In this case, the traffic police have designated the affected section as restricted while the crane and concrete pump are placed and used for the project-related operation.

Motorists travelling towards or near Sterling Hospitals have been advised to account for the closure before starting their journey. The restriction will remain operational until 11pm on November 5, after which the affected road section is scheduled to be opened to traffic once the construction-related work is complete.


RELATED ARTICLES

Most Popular

Latest News