ACME Solar Holdings Limited has signed power purchase agreements for two renewable-energy projects with a combined capacity of 370 MW, according to Indian Infrastructure. The projects will include solar, wind and battery energy storage components across Madhya Pradesh, Rajasthan and Gujarat.
ACME Greentech Sixteen Private Limited, a wholly owned subsidiary of ACME Solar, has signed a 25-year PPA with Rewa Ultra Mega Solar Limited for a 220 MW solar project integrated with a battery energy storage system at Morena Solar Park in Madhya Pradesh. The project was awarded at a tariff of Rs 2.764 per unit, with commercial operation scheduled for December 31, 2027.
Separately, ACME Alpha Renewables Private Limited has signed a 25-year PPA with NTPC Limited for a 150 MW interstate transmission system-connected hybrid project under NTPC’s Hybrid-IV tranche. The project will combine solar and wind generation with energy storage across Bhadla in Rajasthan, Jambkhabalia in Gujarat and Mandsaur in Madhya Pradesh.
Power supply from the hybrid project is scheduled to begin on June 30, 2028, at a tariff of Rs 3.21 per unit, the report said.
Following the agreements, ACME Solar’s PPA-backed under-construction portfolio has risen to 5,080 MW. Its total under-construction contracted capacity stands at 5,380 MW, according to the report.
The projects add planned renewable generation and storage capacity to India’s power system, while the interstate transmission connection is intended to support electricity supply across state boundaries. The available report does not provide further details on the storage capacity, construction milestones or transmission infrastructure for either project.


