HomeAnalysisDDA Moves Ahead With Five New Pedestrian Links in Dwarka

DDA Moves Ahead With Five New Pedestrian Links in Dwarka

The Delhi Development Authority (DDA) has invited quotations to appoint a consultancy agency for designing three foot overbridges (FOBs) and two skywalks at five locations in Dwarka, as residential and commercial activity expands across the sub-city.

The proposed structures are not yet approved for construction. They will first be assessed through traffic and soil studies, feasibility reports and scrutiny by the FOB/Subway Committee. The consultancy will also prepare topographical surveys, conceptual drawings, 3D walkthroughs, detailed architectural, structural and electrical designs, and cost estimates.

The proposed FOB locations include a crossing between Sectors 22 and 23 near Delhi International School on MP Road 226; a connection between Jai Hind Apartments in Sector 2 and Apna Niwas in Sector 1 on Road 224; and a third crossing near DPS Rajapuri, also identified as Ekta Apartments, on MP Road 201 in Sector 3.

The two planned skywalks would serve market areas. One square-shaped structure is proposed to connect markets in Sectors 4, 5, 11 and 12. The other, an L-shaped skywalk, would link markets in Sectors 6 and 10 with the Sector 11 Sports Complex.

The road right of way at the five locations ranges from 45 metres to 60 metres. The proposed FOBs near Delhi International School and Jai Hind Apartments are on roads with a 60-metre right of way, while the other three sites have a 45-metre right of way.

According to the report, inspections were conducted at the proposed sites in the presence of representatives from the Central Road Research Institute, Central Public Works Department, Municipal Corporation of Delhi, Delhi Traffic Police, Unified Traffic and Transportation Infrastructure (Planning and Engineering) Centre, and Delhi Transport Department. Their involvement indicates that the proposals will require coordination across agencies before any construction decision is taken.

The DDA has estimated the consultancy cost at Rs 48 lakh and specified an earnest money deposit of Rs 96,000. The appointed agency will be required to complete the assignment within 120 days.

For residents, workers and visitors, the immediate significance is that five locations have entered a formal design and assessment process for dedicated pedestrian connections. However, the eventual construction, design approvals, funding and implementation schedule remain unresolved in the available information. The traffic and soil studies, feasibility findings and committee scrutiny will determine whether the proposed links proceed beyond consultancy.


RELATED ARTICLES

Most Popular

Latest News