Vasai West’s Babhola Road has become uneven after repeated excavation, resurfacing and patchwork linked to utility works, making travel difficult for motorists, according to a report by Loksatta.
The road has been excavated at different locations for the installation of water pipelines by the Vasai-Virar City Municipal Corporation. After the pipeline work, the affected sections are being resurfaced with asphalt. The report said that repeated repairs for different works have left parts of the road with uneven raised sections and patched surfaces.
Several of the raised portions have reportedly worn smooth, but the uneven surface continues to make driving difficult. Loksatta said the condition has increased the risk of accidents and caused inconvenience to residents and other road users. The report did not cite a confirmed accident count or provide a response from the municipal corporation or the contractors involved.
The road condition has also been linked in the report to preparations for the mayor’s marathon scheduled for December. It said that additional layers of aggregate and asphalt were being spread on roads in connection with the event, even as other sections were undergoing utility-related work.
The situation highlights the coordination problems that can arise when the same urban road is repeatedly opened for separate works and subsequently repaired by different contractors. Each intervention may address a specific requirement, but inconsistent reinstatement can leave a road with abrupt level changes and a surface that deteriorates unevenly.
For motorists, the immediate concern is the difficulty of anticipating raised or worn sections, particularly where resurfacing has produced different road levels. The report’s account indicates that Babhola Road requires more consistent reinstatement and surface management after utility works. It does not, however, establish whether the municipal corporation has ordered a comprehensive inspection or set a deadline for corrective repairs.


