HomeAnalysisCIDCO Tests Higher Building Heights for Parsik Hill Plots

CIDCO Tests Higher Building Heights for Parsik Hill Plots

CIDCO has begun assessing whether two land parcels on Parsik Hill in CBD Belapur can receive higher building height clearances, subject to aviation-safety requirements linked to Navi Mumbai International Airport.

The development authority has issued a Request for Proposal inviting internationally experienced consultancy firms to undertake an aeronautical assessment of the plots and pursue the maximum permissible height clearance from the Airports Authority of India (AAI). The exercise concerns Plot Nos. 102, 103 and 104 in Sector 26, measuring approximately 1,343 square metres, and Plot Nos. 197 and 203 in Sector 27, measuring around 1,304 square metres.

The proposed assessment will determine the maximum permissible building elevation in terms of Above Mean Sea Level. It will consider the existing ground levels at the sites and aviation-related restrictions arising from Obstacle Limitation Surfaces, flight procedures and Communication, Navigation and Surveillance installations.

The process is significant because land around airports can face limits on vertical development even where local planning permissions may otherwise allow construction. In this case, CIDCO is seeking to establish the highest elevation that can be technically and legally pursued without compromising aviation-safety requirements.

According to the RFP, the appointed consultant will first take up the regular height-clearance process with the AAI’s Western Region. If the clearance granted is lower than the elevation considered technically feasible, the consultant may represent CIDCO before the appellate authority at AAI headquarters in New Delhi. Any such representation would remain subject to technical feasibility and CIDCO’s written instructions.

The assignment may also involve coordination with the Ministry of Civil Aviation for additional approvals, flight simulations, aviation-safety studies and other technical assessments. The available report does not indicate that any higher clearance has been granted or that construction has been approved on either parcel.

CIDCO has asked the consultant to look beyond current aviation rules as part of the exercise. The assessment will examine the possibility of obtaining higher clearances over the next five to 10 years by considering potential changes in airport operations, aviation infrastructure and regulations prescribed by the International Civil Aviation Organization.

The final report is expected to present three separate assessments: the height permissible under existing regulations; any additional height that could potentially be secured through specialised technical studies and appeals; and the scope for further clearance if regulations change in the future.

For Belapur, the outcome could influence how efficiently these relatively small, strategically located parcels are developed. However, the exercise is presently an evaluation of development potential rather than a final construction approval. The eventual height of any building would depend on the aviation clearances, technical studies and approvals obtained through the prescribed process.


RELATED ARTICLES

Most Popular

Latest News