HomeBreaking NewsBengaluru Opens Railway Vents to Tackle Sai Layout Flooding

Bengaluru Opens Railway Vents to Tackle Sai Layout Flooding

Two new railway vents built at Geddalahalli to address recurring flooding in Bengaluru’s Sai Layout have been completed at a cost of Rs 16.12 crore, according to a report by Deccan Herald.

The project was inaugurated by Karnataka Chief Minister DK Shivakumar on Wednesday. The vents are intended to prevent the reverse flow of rainwater that has repeatedly inundated the residential layout during heavy rain.

According to the Bengaluru East City Corporation, each vent is six metres wide, five metres high and 32 metres long. The civic body said the structures have been built to support the smooth movement of water along the Hebbal Valley.

Residents told Deccan Herald that the area had not flooded since the vents were constructed. They nevertheless raised concerns about the irregular desilting of the rajakaluve, or stormwater channel, and the removal of weeds from it.

The condition and maintenance of connected stormwater infrastructure remain an issue in the wider area. Parts of Hennur Road experienced waterlogging a few weeks ago, renewing concerns about the upkeep and capacity of stormwater drains.

The new vents are therefore one part of the flood-mitigation response at Geddalahalli, while the continued functioning of the connected drainage network will depend on regular maintenance. The report did not provide details on a schedule for desilting the rajakaluve or on further works planned for the stormwater system.


RELATED ARTICLES

Most Popular

Latest News