The Jaipur Development Authority has begun the second phase of its anti-encroachment drive on New Sanganer Road, removing unauthorised structures from more than 80 houses and shops along an 800-metre stretch near Gurjar Ki Thadi. The action follows the Rajasthan High Court’s strict stance on restoring the road’s sanctioned 100-foot width.
The current operation is being carried out from Metro pillar number 84 near Gurjar Ki Thadi to Hotel Lazeez in Sodala, close to Vivek Vihar Metro Station. JDA teams first began removing steps constructed on the footpath near the metro pillar. Ramps, railings, footpaths, tin sheds, staircases and boundary walls falling within the designated road limit are also being demolished.
The front portion of Hotel Lazeez near Vivek Vihar Metro Station has been demolished as part of the operation. When officials moved towards a three-storey house, the entire family stood outside the property and opposed the action. The family alleged that the administration was acting arbitrarily, while a woman said the house being demolished had been built with the family’s lifetime savings.
The drive is part of a larger plan covering the approximately 2.4-kilometre stretch between the Gurjar Ki Thadi intersection and the Sodala crossing. According to the report, the JDA has identified 260 unauthorised constructions for removal across this corridor. Although the road is planned to be 100 feet wide, encroachments have reduced its usable width in several places to between 40 and 60 feet.
The first phase was carried out on October 5 between Gurjar Ki Thadi and Vivek Vihar. During that operation, the JDA removed unauthorised structures from around 50 houses and shops across approximately 600 metres. The second phase extends the clearance operation towards the Sodala side and includes both commercial frontage and residential properties.
The action highlights the administrative challenge of enforcing planned road widths in built-up urban corridors, where ramps, stairs, boundary walls and shop extensions gradually occupy public or designated road space. For residents and businesses, the operation directly affects property access and structures at the edge of their premises. The JDA’s ongoing drive is intended to clear the remaining identified encroachments along the New Sanganer Road corridor.


