HomeBreaking NewsMandi-Jaunapur Road Faces Congestion Crisis as NHAI Review Begins

Mandi-Jaunapur Road Faces Congestion Crisis as NHAI Review Begins

The Centre has begun examining a proposal to bring the Mandi-Jaunapur Road in south Delhi under the National Highways Authority of India (NHAI), a move that could lead to its widening and redevelopment if the road meets prescribed criteria. The review follows repeated requests from South Delhi MP Ramvir Singh Bidhuri, who has described the stretch as a major traffic bottleneck affecting links between Delhi, Haryana and the wider NCR.

Union road transport and highways minister Nitin Gadkari informed Bidhuri about the development in a letter. Gadkari said officials had been directed to examine the proposal in view of the need for highway infrastructure development in the South Delhi parliamentary constituency. The minister also clarified that roads must meet the prescribed criteria before they can be brought under NHAI’s jurisdiction.

The proposal does not yet amount to a formal transfer of the road to NHAI. It begins an evaluation process in which the road’s suitability for inclusion in the Centre’s new highway development programme will be considered. The supplied report does not specify the criteria being applied, the agency responsible for the assessment or a timeline for a final decision.

Bidhuri had raised the issue in the Lok Sabha, arguing that the Mandi-Jaunapur Road has become a critical missing link between two heavily used corridors. The Faridabad-Gurgaon Road and the Mehrauli-Gurgaon Road have already been taken over by NHAI, according to the MP, while the Mandi-Jaunapur stretch connecting them continues to experience severe congestion.

The road’s reported dimensions are central to the dispute over its current performance. Although the stretch is designated as a 200-foot-wide master plan road, its actual width at several locations is around 30 feet, Bidhuri said. The difference between the planned width and the road available to traffic has been cited as a key reason for prolonged jams and disrupted movement on adjoining routes.

For commuters, any improvement would depend first on the outcome of the Centre’s examination and then on the administrative and construction steps that follow a possible transfer. Widening and redevelopment would also require the authorities to determine how the existing corridor can be brought into line with the proposed highway standards, but no land, funding, tender or construction details have been announced.

The road is part of a wider cross-border movement network linking southern Delhi with Haryana and other NCR destinations. Its congestion therefore affects not only local traffic but also vehicles using the connected Faridabad-Gurgaon and Mehrauli-Gurgaon routes. The next official milestone is the completion of the examination ordered by the road transport and highways ministry, after which the Centre is expected to decide whether the Mandi-Jaunapur Road qualifies for inclusion under NHAI.


RELATED ARTICLES

Most Popular

Latest News