HomeBreaking NewsYamuna Bridge Link Road Gets ₹25.5 Crore Haryana Tender

Yamuna Bridge Link Road Gets ₹25.5 Crore Haryana Tender

A two-lane link road will be built on the Haryana side of the proposed Yamuna bridge near Murtazabad village in Hasanpur to connect the crossing with the state road network, with the work estimated to cost ₹25.56 crore excluding GST and scheduled for completion within two years.

The Public Works Department (Buildings and Roads) has issued a tender to select the construction agency for the approach road. The project is intended to provide road access to the bridge being built between Haryana and Uttar Pradesh and improve movement for residents travelling between the two states.

According to the tender details reported by Live Hindustan, the estimated cost of the work is ₹25 crore 55 lakh 63 thousand, excluding GST. Construction on the Haryana side will include a new road as well as improvements to existing stretches wherever required to connect vehicles to the bridge.

The proposed work covers earthwork, preparation of a strengthened road base and laying of a bituminous surface. These components are intended to create an all-weather approach for vehicles travelling towards the bridge. The tender also includes provisions for drainage, including roadside drains and other structures needed to remove rainwater from the road.

Drainage is a significant part of the approach-road design because water accumulation can affect the usability and durability of roads, particularly during periods of heavy rain. The tender provisions indicate that the project is not limited to laying a carriageway but also includes basic supporting infrastructure for access and surface-water management.

Night-time visibility is another component of the project. Two high-mast lights, each 12.5 metres high, are proposed along the route to illuminate the approach to the bridge and nearby areas. Road signs and direction boards will also be installed to help drivers identify the route and navigate towards the crossing after dark.

The bridge at Murtazabad is intended to serve as an important road connection between Haryana and Uttar Pradesh. However, a bridge can deliver that connectivity only when its approaches are linked effectively to the surrounding road network. The Haryana-side project therefore addresses the last-mile connection between the bridge structure and vehicles travelling through the state.

For villages near the crossing, the new approach road could provide a more direct route towards the neighbouring state, although the report does not specify expected traffic volumes, travel-time savings or the exact alignment of the road. The available project details also do not state the tender deadline, the selected contractor or the date on which construction will begin.

The immediate next step is the selection of a construction agency through the tender issued by the Haryana Public Works Department. The department’s stated construction timeline is two years from the start of the work.


RELATED ARTICLES

Most Popular

Latest News