Chandigarh’s electricity network became substantially more reliable during the July-September quarter, but the city’s rising complaint volumes show that fewer power interruptions do not automatically translate into a smoother consumer experience. Data submitted by Chandigarh Power Distribution Ltd (CPDL) to the Joint Electricity Regulatory Commission (JERC) shows a sharp fall in interruption frequency and duration, even as fresh complaints increased by 15% to 61,041.

The figures present two different pictures of the same electricity system. On the network side, interruptions affecting consumers connected to 11kV feeders declined significantly. On the service side, complaints about cables, billing, scheduled outages, meters, connections and substations increased. Together, the numbers indicate that electricity reliability is only one part of utility performance. Consumers also judge the system by how accurately they are billed, how quickly faults are addressed and how predictable planned outages are.

## What the reliability data shows

The report’s principal reliability indicators recorded a marked improvement through the quarter. The System Average Interruption Frequency Index, or SAIFI, which measures sustained interruptions lasting more than three minutes, fell from 2.27 in July to 1.79 in August and 1.29 in September. Compared with June’s figure of 5.37, the September level represented a reduction of nearly 76%.

The System Average Interruption Duration Index, or SAIDI, also declined from 1.45 in July to 0.64 in September. It had stood at 2.21 in June. The Momentary Average Interruption Frequency Index, which covers interruptions lasting three minutes or less, fell from 5.58 in June to 1.29 in September.

These indices cover 2,61,325 consumers connected to 11kV feeders, excluding agricultural feeders. The improvement reversed the trend recorded during the April-June quarter, when SAIFI rose from 3.74 in April to 5.37 in June and SAIDI increased from 1.48 to 2.21.

The data therefore suggests that the distribution network performed better during the second quarter under review. However, the indices describe interruption patterns across the network; they do not capture every source of dissatisfaction experienced by consumers. A household may face no prolonged outage and still raise a complaint about an incorrect bill, a faulty meter, a scheduled shutdown or a delayed connection-related service.

## Why complaints rose while outages fell

Fresh complaints increased from 53,057 in April-June to 61,041 in July-September, an addition of 7,984 complaints. Cable-related issues accounted for the largest share. Complaints concerning overhead lines and underground cables rose from 33,719 to 36,544, representing nearly 60% of all fresh complaints in the second quarter.

This is the clearest indication that network reliability cannot be assessed only through aggregate interruption indices. The report records fewer sustained interruptions, but cable faults remained the largest complaint category. The available figures do not establish whether the rise reflects more faults, greater reporting by consumers, improved complaint registration, or a combination of these factors. They do show that the physical distribution network remained the main point of contact between the utility and consumers.

Billing complaints increased from 6,814 to 7,280 during the quarter. CPDL attributed the rise primarily to the transition from bimonthly to monthly billing following a JERC directive. At the end of June, 595 billing complaints were pending. After 7,280 fresh complaints were received during the second quarter, the total reached 7,875. CPDL reported that all had been redressed by the end of September, although 814 were resolved beyond the stipulated time.

That distinction matters. A complaint being marked as resolved does not necessarily mean it was resolved within the service standard prescribed by the regulator. The report’s figures indicate complete redressal by September-end in the billing category, but also show that a significant number crossed the stipulated resolution period. For consumers, the duration of the grievance process can be as important as the eventual correction.

## The service system behind the numbers

Scheduled outage complaints more than doubled, rising from 1,570 in the first quarter to 3,710 in the second, an increase of 136%. This category points to a different operational problem from unexpected feeder interruptions. A planned outage may be necessary for maintenance or network work, but its effect on consumers depends on whether information is timely, accurate and accessible.

Meter complaints rose from 728 to 1,176, while complaints relating to the transfer of connections and related services increased from 796 to 2,579. Complaints associated with grid substations and power transformers climbed from 1,905 to 3,334. These categories extend beyond the narrow question of whether electricity is available at a given moment. They relate to the administrative and physical systems through which consumers receive, measure and manage their connections.

The report also records 1,021 faulty or defective meters added during the quarter. All were shown as rectified or replaced by the end of September. That outcome indicates a complete closure of the recorded meter-replacement workload, but the number of new defective meters still illustrates the scale of monitoring and field-service activity required in a large urban distribution system.

Some complaint categories improved. Voltage fluctuation complaints fell from 5,502 to 4,895, normal fuse-off complaints declined from 1,041 to 888, and distribution-transformer failure complaints edged down from 639 to 635. The mixed movement across categories is important: the rise in total complaints was not uniform, and the system recorded improvement in some specific areas even as cable, billing, outage scheduling and connection-service complaints increased.

## What the report does and does not establish

The quarterly figures provide a useful measure of reported performance, but they do not by themselves explain the causes behind every change. The report attributes the increase in billing complaints to the shift from bimonthly to monthly billing. It does not provide a comparable explanation in the supplied material for the rise in cable, scheduled-outage, connection-transfer or substation-related complaints.

Nor do the figures establish whether complaints were concentrated in particular sectors, neighbourhoods, feeder areas or consumer categories. The reliability indices cover consumers connected to 11kV feeders and exclude agricultural feeders, while the complaint totals are presented by category. The supplied report does not provide a geographic breakdown that would show whether network improvements were evenly distributed across Chandigarh.

This limits what can be concluded about the lived experience of individual neighbourhoods. A citywide fall in SAIFI and SAIDI may coexist with recurring localised problems. Similarly, a citywide rise in complaints may reflect particular service processes rather than a general deterioration in supply. The evidence supports a clear conclusion about the coexistence of better aggregate reliability and higher consumer dissatisfaction, but not a complete explanation of the gap.

## The governance challenge for urban utilities

The report was submitted by CPDL to JERC, placing the figures within a regulatory reporting framework rather than treating complaints as isolated customer-service incidents. Reliability indices, complaint categories, stipulated resolution times and meter-replacement records allow the regulator to examine different parts of the distribution system together.

That framework also reveals why utility performance needs more than one benchmark. SAIFI and SAIDI measure interruption frequency and duration. Complaint data captures issues that those indicators cannot fully represent, including billing changes, planned shutdowns, connection transfers and faulty meters. A distribution company may improve one set of indicators while facing pressure in another part of the service chain.

The transition to monthly billing demonstrates how a regulatory or operational change can affect consumer interaction with the utility even when the electricity network itself is functioning better. In this case, CPDL linked the increase in billing complaints to the billing-cycle change and reported that the complaints were being resolved faster than new ones were being received. The report nevertheless records 814 cases resolved beyond the stipulated time, showing why speed of closure and compliance with service standards must be tracked together.

For urban governance, this is a question of institutional visibility. Consumers experience the electricity system as one service, while the utility measures it through separate technical and administrative indicators. The regulatory report brings those indicators into the same record, making it possible to see that improved supply continuity does not eliminate problems in billing, metering, maintenance communication or connection management.

## The bigger urban question

Electricity distribution is a core urban utility because its performance affects homes, businesses and public services across the city. The Chandigarh figures show that infrastructure reliability and service reliability are related but not identical. A reduction in interruptions is an important operational gain, but it does not settle whether consumers can obtain accurate bills, receive timely information about planned outages or secure prompt resolution of connection and meter issues.

The most significant finding in the report is therefore not simply that outages declined or complaints increased. It is that both occurred during the same quarter. That contrast shifts attention from a single headline measure of power supply towards the complete chain of urban utility delivery: physical cables and feeders, substations and transformers, meters and billing systems, complaint registration and resolution timelines.

The available evidence confirms a substantial improvement in Chandigarh’s reported electricity reliability during July-September. It also confirms a 15% increase in fresh complaints, with cable-related issues forming the largest category and billing complaints rising during the move to monthly billing. What remains unresolved in the supplied material is why several complaint categories increased and whether the trends were concentrated in specific parts of the city. Future quarterly reports will show whether the improvement in interruption indices is sustained and whether the complaint burden, particularly in cable and service-related categories, begins to narrow.