HomeLatestNMMC Schedules 18 Hour Water Disruption for Morbe Pipeline Repairs On July...

NMMC Schedules 18 Hour Water Disruption for Morbe Pipeline Repairs On July 18 19

Navi Mumbai is scheduled to experience an 18‑hour water supply disruption from 10 am on Friday, July 18 to 4 am on Saturday, July 19, as the Navi Mumbai Municipal Corporation (NMMC) undertakes essential Morbe pipeline connection work. This intervention, while temporarily inconvenient for residents, is crucial to enhancing long‑term reliability of the city’s water infrastructure.

The Morbe main pipeline, a critical artery supplying potable water across numerous Navi Mumbai nodes, has suffered repeated leakages along Palm Beach Road near Nerul Sector 46. In response, NMMC officials planned a parallel pipeline installation and will shortly connect the new segment to the existing 1,700 mm diameter line. This scheduled shutdown is a necessary step to integrate and stabilise the supply system. Key zones under direct impact during this interruption include Belapur, Nerul, Vashi, Turbhe, Sanpada, Koparkhairane, Ghansoli and Airoli, as well as CIDCO-administered areas such as Kharghar and Kamothe. Residents are advised to secure adequate water supplies ahead of the outage. While supply is slated to resume later on Saturday, reduced pressure is anticipated until full stabilisation is achieved.

NMMC’s water infrastructure director emphasised the social and environmental rationale behind the move, stating that the connection will curtail recurrent leakages, reduce water wastage and support equitable access. Experts aligned with the corporation note that such periodic maintenance is integral to a zero‑net‑carbon urban agenda, as it minimises resource loss and supports eco‑efficient city planning. Though pressure drops and temporary supply may inconvenience households, the strategic benefit is significant. Multiple leak points have cumulatively eroded trust in pipe holdings; this upgrade aims to prevent similar disruptions and safeguards integrity on the supply network. Sustaining water delivery to Navi Mumbai’s growing population demands infrastructure resilience—this targeted work is a step in that direction.

NMMC officials stress that the scheduled work aligns with broader efforts to create sustainable, gender-inclusive, community-sensitive urban services. Ensuring uninterrupted potable water is foundational to equitable city living, enabling all residents access regardless of local pressure variations or service tiers. As the outage weekend approaches, NMMC has mobilised response teams to monitor restoration and manage pressure variations. Citizens can expect a return to normal supply Saturday evening, with flows progressively stabilising overnight.

This repair marks a forward‑looking investment in urban resilience—despite momentary inconvenience, the long‑term gains for Navi Mumbai’s water security and sustainable cityscape make this a vital operation in the collective interest.

Also Read : KMC Work Damages 3 Metre Stretch of Kolkata Metro Diaphragm Wall

NMMC Schedules 18 Hour Water Disruption for Morbe Pipeline Repairs On July 18 19
RELATED ARTICLES
- Advertisment -spot_img

Most Popular

Latest News

Recent Comments