HomeLatestDumka NLC India Begins Pachwara South Coal Mining To Fuel Ghatampur Plant

Dumka NLC India Begins Pachwara South Coal Mining To Fuel Ghatampur Plant

Mining operations have officially begun at the Pachwara South coal block in Dumka, Jharkhand, as NLC India Limited moves to secure fuel for the 1,980 MW Ghatampur Thermal Power Plant in Uttar Pradesh. The newly developed block, with extractable reserves of 264.84 million tonnes, is expected to produce around nine million tonnes annually, marking a key milestone in regional energy planning, ensuring a steady coal supply while supporting local employment and infrastructure development.

The Pachwara South coal block, previously unexplored, has been allocated to Neyveli Uttar Pradesh Power Limited (NUPPL), a joint venture between NLC India Limited (51%) and UP Rajya Vidyut Utpadan Nigam Limited (49%). Officials said the joint venture structure allows direct coal linkage to the Ghatampur plant, reducing transportation costs and supply risks for one of Uttar Pradesh’s largest upcoming thermal projects. The coal extracted is mid-grade (G10), suitable for sustained base-load electricity generation.Industry analysts note that captive coal blocks such as Pachwara South are increasingly vital in India’s energy strategy, balancing domestic coal production with the growing demand for reliable power. “Direct linkage between mines and power plants ensures operational efficiency and mitigates fuel price volatility, which is critical for large-scale thermal units,” an energy expert commented. The project also underscores the broader policy focus on synchronising fuel availability with power infrastructure planning.

Beyond energy supply, the mining operation carries significant regional implications. Dumka, part of a largely rural district, is expected to see employment growth and improvements in logistics, roads, and allied services as operations scale up. Urban development experts emphasise that while industrial projects boost local economies, careful planning is needed to maintain environmental balance, land-use equity, and inclusive benefits for surrounding communities.NLC India Limited confirmed that the first extraction activities began on 19th December 2025, following comprehensive geological surveys, drilling, and regulatory approvals. The project aligns with India’s ongoing push for energy security, enabling a smoother transition in the electricity mix as renewable sources are integrated into the grid. Reliable coal supply from Pachwara South is expected to complement renewable generation, supporting grid stability and long-term decarbonisation strategies.

As mining ramps up, policymakers and industry stakeholders face the challenge of integrating industrial growth with sustainability and social responsibility. Analysts say such projects can anchor regional development while contributing to India’s climate and energy targets if environmental safeguards, community inclusion, and urban planning priorities are maintained.

Also read: Maharashtra Shree Cement To Set Up Rs 2000 Crore Manufacturing Plant New

Dumka NLC India Begins Pachwara South Coal Mining To Fuel Ghatampur Plant
RELATED ARTICLES
- Advertisment -spot_img

Most Popular

Latest News

Recent Comments