The Amritsar-Jamnagar Expressway, a pivotal infrastructure project under India’s Bharatmala Pariyojana, has achieved a significant milestone with over 85% of its construction completed.
Spanning approximately 1,257 kilometers, this greenfield expressway is poised to transform connectivity across Punjab, Haryana, Rajasthan, and Gujarat, effectively halving the travel time between Amritsar and Jamnagar from 26 hours to about 13 hours Recent updates from the National Highways Authority of India (NHAI) indicate that the remaining construction, primarily in Rajasthan and Gujarat, is in the final stages of paving and structural development Key infrastructural components, including land acquisition and bridge works across rivers in Rajasthan, have been completed, addressing earlier project bottlenecks.
Trial runs have commenced on significant stretches such as Bhatinda to Jodhpur and Ajmer to Rajkot, with over 1,100 kilometers of the expressway now motorable. Concurrent development of toll plazas, rest stops, and service infrastructure is underway to accommodate the anticipated traffic flow upon full operation True scoop  Strategically designed to bolster economic activity, the expressway connects major industrial and agricultural hubs. It links three significant oil refineries—HMEL Bathinda, HPCL Barmer, and RIL Jamnagar—and two power plants, facilitating efficient movement of goods and resources . This connectivity is expected to reduce logistics costs by 20–25%, benefiting exporters and producers, particularly in the petrochemical, agricultural, and textile industries.
The expressway’s alignment also integrates with existing national highways and expressways, enhancing inter-regional connectivity. It connects with the Delhi-Amritsar-Katra Expressway via Ludhiana-Bathinda spur and the Amritsar Ring Road, providing seamless travel options for commuters and freight transporters Environmental considerations have been integral to the project’s development. The expressway’s design includes measures to minimize ecological impact, and its completion is anticipated to contribute to reduced vehicular emissions by facilitating smoother traffic flow and reducing congestion.
With the project on track for a December 2025 inauguration, preparations are in place to mitigate potential delays due to monsoon conditions. Trial runs and safety audits are scheduled to commence by October 2025, ensuring readiness for full-scale operations . The Amritsar-Jamnagar Expressway stands as a testament to India’s commitment to developing sustainable and efficient infrastructure. By enhancing connectivity, reducing travel time, and stimulating economic growth across multiple states, it exemplifies the transformative potential of strategic infrastructure projects in fostering equitable and eco-friendly urban development.
Amritsar Jamnagar Expressway Nears Completion