HEG Ltd has announced a Rs 650 crore brownfield expansion of its graphite-electrode manufacturing facility in Mandideep, Madhya Pradesh, as the company begins trading as an independently listed entity following the demerger of its graphite-electrodes business.
The expansion is intended to raise the plant’s annual capacity from 100,000 tonnes to 115,000 tonnes, with production targeted to begin in the first quarter of calendar year 2028, according to a company statement reported by PTI. The project will use existing infrastructure and is expected to have less than half the capital intensity of a greenfield plant, the statement said.
HEG’s demerged business was listed on the BSE and the National Stock Exchange on November 27. The demerger was implemented under a Composite Scheme of Arrangement sanctioned by the National Company Law Tribunal, Indore Bench, which took effect on September 1, 2026.
The Mandideep facility produces ultra-high-power graphite electrodes, which are used in steelmaking. HEG exports approximately 65 to 70 per cent of its production to more than 35 countries, according to the company. The plant’s existing energy assets include an 18 MW captive hydro plant at Tawa and a 6 MW solar plant at Mandideep.
The project links the company’s corporate restructuring with an expansion of manufacturing capacity at an established industrial location. However, the report does not provide details of the expansion’s land requirements, construction schedule, employment impact, statutory approvals or any planned changes to local transport and utility infrastructure.
HEG shares closed at Rs 551 on the BSE and Rs 557.65 on the NSE on November 27, PTI reported.


