Residents have warned of a road blockade if potholes on the Khed-Kanersar route in Khed taluka are not repaired within eight days, after deteriorated stretches near Retawdi, Mandavala and Holewadi raised concerns over vehicle safety.
The route connects the eastern part of Khed taluka and carries heavy vehicles, two-wheelers and cars each day. Residents told the Public Works Department (PWD) that large potholes have made travel difficult and increased the risk of collisions, particularly at night when drivers may not be able to see damaged sections clearly.
The Holewadi stretch of the road connecting to the Pune-Nashik highway has also developed large potholes, according to the report. Residents said drivers are forced to manoeuvre around the damaged areas, creating additional risk when vehicles approach from the opposite direction. The report said some two-wheeler riders had previously been injured in accidents on the route.
Retawdi gram panchayat member Kiran Pawar, former chairperson of a local purchase-and-sale association Anandrao Kale and Atul Thite have sought immediate repairs from the PWD. They have warned that residents will stage a road blockade if the potholes are not filled and the road is not made safer within eight days.
Ajinkya Shinde, sub-engineer with the PWD’s Khed division, said pothole-filling work was currently under way on the Khed-Nimgaon Khandoba road. Once that work is completed, repairs on the Khed-Kanersar road will be undertaken within four to five days, he said.
The department’s stated schedule places the promised repair work within the deadline set by residents. The report does not specify the extent of the damaged road, the repair method or whether any longer-term resurfacing proposal has been approved.


