HomeBreaking NewsPanoli GIDC Closes Canal Bridge Route for 90-Day Renewal

Panoli GIDC Closes Canal Bridge Route for 90-Day Renewal

Demolition and renewal work has begun on a dilapidated bridge over the Ukai Right Bank Canal at Panoli GIDC in Gujarat’s Ankleshwar industrial area, prompting the closure of a route used to reach the Panoli police station and fire station.

The bridge is located on the road linking Panoli GIDC near the Sanjali Maharaj Nagar turn. The structure had reportedly become hazardous after its side divider was damaged, increasing the risk to motorists. The Irrigation Department had earlier restricted movement on the bridge and installed a warning board.

The Ukai Right Bank Canal Department has now started dismantling the bridge during a 90-day shutdown period to undertake its renewal, according to a report by Nav Gujarat Samay.

With demolition under way, the road from the Sanjali Maharaj Nagar turn towards the Panoli police station and fire station has been closed. Motorists travelling to Panoli GIDC from the highway have been advised to use Gate No. 1 at Panoli or Gate No. 3 near Kharod.

Diversions have also been arranged on internal roads to maintain movement between industrial units inside the estate. The report said these arrangements were determined by the notified department and the Panoli Udyog Mandal.

The bridge carries traffic associated with the industrial estate, including heavy vehicles. Its location on the route towards the police and fire stations makes continued access for emergency services an immediate operational concern during the closure. The reported diversion plan is intended to maintain movement while the unsafe structure is removed and renewed.

The report does not provide details on the replacement bridge’s design, contract value or expected completion date beyond the stated 90-day shutdown period.


RELATED ARTICLES

Most Popular

Latest News