The elevated road used for passenger drop-offs and premium parking at Ahmedabad’s Kalupur railway station has been closed as construction of the North Multi-Modal Transport Hub (MMTH) begins under the station redevelopment project, according to a report by Gujarat Samachar.
Parking facilities linked to the elevated road have been shifted to the South MMTH building. The railway administration has appealed to passengers and vehicle operators to follow the revised arrangement.
The elevated road was created near the station entry gate before work on the South block began. It allowed passengers arriving by taxi or auto-rickshaw to be dropped off directly on the bridge, while taxis could also use premium parking there before exiting the station premises.
The closure is intended to allow construction of the North MMTH to proceed without obstruction. The report said structural work on the basement and other floors of the South MMTH block is nearly complete, while construction of the North block has started at full pace.
The South and North MMTH buildings are planned as integrated transport facilities at the station. According to the report, the hubs are intended to support transfers between trains, the metro, city bus services operated by AMTS and BRTS, and auto-rickshaws, along with parking facilities.
The immediate change means passengers using taxis or private vehicles will need to follow the access and parking arrangements at the South MMTH instead of using the closed elevated road. The report does not specify how long the closure will remain in effect or provide details of temporary traffic signage and pedestrian routing around the construction area.


