Bhopal Municipal Corporation (BMC) carried out a citywide anti-encroachment drive on Thursday, demolishing roads, boundary walls and buildings linked to allegedly illegal colonies and unauthorised construction, while separately halting part of a demolition operation near Arera Colony’s 10 Number Market.
The civic body said the action covered nearly 30 acres of land estimated to be worth ₹60 crore. Teams deployed bulldozers in Karond, Badbai, Lambakheda, Nabibagh and Khajurikalan, where roads and boundary walls of four allegedly unauthorised colonies were removed.
In Khajurikalan, the BMC acted against the approximately one-acre SR Green colony. The drive also targeted Krishna Kunj Phase-2 in Badbai, Venkatesh Nagar in Lambakheda and another colony in Nabibagh. In Malviya Nagar, an unauthorised 3,000-square-foot ground-plus-one structure was demolished. A dilapidated multi-storey building opposite Atal Bhawan was also razed.
The most contentious action took place near 10 Number Market, where a BMC team arrived with a JCB to demolish a commercial structure allegedly being built on a plot leased for residential use. The structure reportedly included a basement and a ground floor. Demolition began and part of the building was brought down, but the operation was then stopped and the team left the site.
The report said there was speculation that a phone call from senior officials led to the halt, but the BMC has not confirmed this. The circumstances therefore remain unclear.
The operation followed concerns raised by Additional Chief Secretary Sanjay Dubey about inadequate enforcement against building violations, according to the report. BMC commissioner Ramprakash Ahirwar said action would continue against constructions that violate building regulations and that all identified violations would face appropriate action.
The contrasting outcomes—demolition across several peripheral locations and an incomplete operation at a prominent market—put the consistency and transparency of municipal enforcement under scrutiny. The BMC’s stated position is that further action will continue against identified violations.


