Pune’s Bhide Bridge has been closed to vehicular traffic from 11 pm on November 17 to facilitate construction of a pedestrian cable bridge connecting the Deccan Metro station, the Pune city traffic police have said. The closure will remain in force until further orders, and motorists have been asked to use designated alternative routes.
The traffic diversion has been announced because construction work for the footbridge is being carried out near the bridge. The traffic department said vehicles that normally use Bhide Bridge will be redirected through other crossings and junctions during the work period.
Traffic travelling via Bhide Bridge towards Deccan has been directed to use the Tilak Chowk–Khandोजibaba Chowk route to reach its destination. Vehicles travelling from the riverbed road towards Deccan may use the Gandharva Hotel Chowk route. The Kelkar Road–Omkareshwar Bridge–Zashi Rani Chowk route has also been identified as an alternative for this movement.
Traffic travelling from the Bhide Bridge side through the riverbed road towards Mehendale Garage Chowk, D P Road, Karve Road and Kothrud has been asked to use Tilak Chowk and Khandojibaba Chowk. Motorists may also use the Tilak Chowk–Shastri Road–Ganjवे Chowk–S M Joshi Bridge route.
The traffic police have specified that only two-wheelers may use the Z Bridge near Pune Hospital. The restriction is intended to regulate movement through the available crossing while the Bhide Bridge closure remains in place.
Vehicles travelling from the Deccan PMPML bus stop towards Kelkar Road and Narayan Peth have also been directed to use the Tilak Chowk–Khandojibaba Chowk route. The traffic branch has asked motorists to follow the designated diversions and cooperate with traffic personnel and support staff deployed in the area.
Deputy Commissioner of Police Dr Sandeep Bhajibhakare, of the Pune city traffic branch, issued the appeal through the traffic department’s public communication. The notification did not specify an end date for the closure, stating that Bhide Bridge would remain shut until further orders. Commuters using the bridge will therefore need to monitor traffic instructions while the pedestrian cable bridge work continues.


