Villages in Nashik district’s Niphad, Sinnar and Yeola talukas will face daily electricity cuts of up to 22 hours from 18 November to 17 December 2026, under an order issued by District Collector Ayush Prasad to support water rotation from Darna dam and regulate irrigation use.
Under the order, electricity supplied through transformers in the affected villages will remain available for two hours each day, from 6 am to 8 am. The decision comes as the district’s rural areas face drought-like conditions and farmers confront pressure on available water resources.
The order was issued after reports were submitted by the Superintendent Engineer and Administrator of the Nashik office of the Command Area Development Authority, as well as the Deputy Executive Engineer of the Nashik Irrigation Department. The stated objective is to ensure that water released during the upcoming rotation reaches the tail-end villages and that arrangements for irrigation and drinking water remain orderly.
The Darna dam’s irrigation and non-irrigation rotation for the 2026-27 rabi season has been proposed from 18 November. The water system covered by the order includes the stretch of the Darna river between Darna dam and the Nandur Madhyameshwar barrage, parts of the Godavari river, and the right and left bank canals of the Godavari.
The collector has also directed that electricity supplies to all unauthorised lift-irrigation schemes drawing water from these river and canal sections be disconnected during the period. The measure links power distribution directly to the administration’s attempt to control withdrawals and distribute the available water through the planned rotation.
The villages named in the order from Niphad taluka are Mhalasakore, Tamswadi, Brahmanwada, Tarukhedle, Khangao, Khedlezunge, Kolgaon, Nandur Madhyameshwar, Dharangaon Veer, Gajarwadi, Dharangaon Khurd, Kanalad, Deogaon, Shirwade, Wakad, Dhanore, Nandgaon, Dehgaon and Rui. The report states that villages in Niphad, Sinnar and Yeola are covered by the decision, but the supplied details list only the Niphad villages.
For residents and farmers, the order means that electricity-dependent water pumps and other rural services may operate within a sharply restricted daily window. The administration’s stated priority is to manage the Darna rotation, protect water delivery to the farthest villages and coordinate irrigation and drinking-water requirements during the rabi season.
The restrictions are scheduled to remain in force until 17 December 2026, according to the collector’s order.


